<?xml version="1.0" encoding="UTF-8" standalone="yes"?>
<Project xmlns="http://schemas.microsoft.com/project">
  <SaveVersion>14</SaveVersion>
  <Name>Release 4.0</Name>
  <Title>Release 4.0</Title>
  <ScheduleFromStart>1</ScheduleFromStart>
  <StartDate>2027-01-04T08:00:00</StartDate>
  <FinishDate>2027-04-06T17:00:00</FinishDate>
  <CalendarUID>1</CalendarUID>
  <DefaultStartTime>08:00:00</DefaultStartTime>
  <DefaultFinishTime>17:00:00</DefaultFinishTime>
  <DurationFormat>7</DurationFormat>
  <StatusDate>2027-02-17T17:00:00</StatusDate>
  <NewTasksAreManual>0</NewTasksAreManual>
  <ProjectExternallyEdited>0</ProjectExternallyEdited>
  <ExtendedAttributes>
    <ExtendedAttribute>
      <FieldID>188743783</FieldID>
      <FieldName>Duration1</FieldName>
      <Alias>Optimistic Duration</Alias>
    </ExtendedAttribute>
    <ExtendedAttribute>
      <FieldID>188743785</FieldID>
      <FieldName>Duration3</FieldName>
      <Alias>Pessimistic Duration</Alias>
    </ExtendedAttribute>
  </ExtendedAttributes>
  <Calendars>
    <Calendar>
      <UID>1</UID>
      <Name>Standard</Name>
      <IsBaseCalendar>1</IsBaseCalendar>
      <BaseCalendarUID>-1</BaseCalendarUID>
      <WeekDays>
        <WeekDay>
          <DayType>1</DayType>
          <DayWorking>0</DayWorking>
        </WeekDay>
        <WeekDay>
          <DayType>2</DayType>
          <DayWorking>1</DayWorking>
          <WorkingTimes>
            <WorkingTime>
              <FromTime>08:00:00</FromTime>
              <ToTime>12:00:00</ToTime>
            </WorkingTime>
            <WorkingTime>
              <FromTime>13:00:00</FromTime>
              <ToTime>17:00:00</ToTime>
            </WorkingTime>
          </WorkingTimes>
        </WeekDay>
        <WeekDay>
          <DayType>3</DayType>
          <DayWorking>1</DayWorking>
          <WorkingTimes>
            <WorkingTime>
              <FromTime>08:00:00</FromTime>
              <ToTime>12:00:00</ToTime>
            </WorkingTime>
            <WorkingTime>
              <FromTime>13:00:00</FromTime>
              <ToTime>17:00:00</ToTime>
            </WorkingTime>
          </WorkingTimes>
        </WeekDay>
        <WeekDay>
          <DayType>4</DayType>
          <DayWorking>1</DayWorking>
          <WorkingTimes>
            <WorkingTime>
              <FromTime>08:00:00</FromTime>
              <ToTime>12:00:00</ToTime>
            </WorkingTime>
            <WorkingTime>
              <FromTime>13:00:00</FromTime>
              <ToTime>17:00:00</ToTime>
            </WorkingTime>
          </WorkingTimes>
        </WeekDay>
        <WeekDay>
          <DayType>5</DayType>
          <DayWorking>1</DayWorking>
          <WorkingTimes>
            <WorkingTime>
              <FromTime>08:00:00</FromTime>
              <ToTime>12:00:00</ToTime>
            </WorkingTime>
            <WorkingTime>
              <FromTime>13:00:00</FromTime>
              <ToTime>17:00:00</ToTime>
            </WorkingTime>
          </WorkingTimes>
        </WeekDay>
        <WeekDay>
          <DayType>6</DayType>
          <DayWorking>1</DayWorking>
          <WorkingTimes>
            <WorkingTime>
              <FromTime>08:00:00</FromTime>
              <ToTime>12:00:00</ToTime>
            </WorkingTime>
            <WorkingTime>
              <FromTime>13:00:00</FromTime>
              <ToTime>17:00:00</ToTime>
            </WorkingTime>
          </WorkingTimes>
        </WeekDay>
        <WeekDay>
          <DayType>7</DayType>
          <DayWorking>0</DayWorking>
        </WeekDay>
      </WeekDays>
    </Calendar>
  </Calendars>
  <Tasks>
    <Task>
      <UID>0</UID>
      <ID>0</ID>
      <Name>Release 4.0</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>0</OutlineNumber>
      <OutlineLevel>0</OutlineLevel>
      <Start>2027-01-04T08:00:00</Start>
      <Finish>2027-04-06T17:00:00</Finish>
      <Milestone>0</Milestone>
      <Summary>1</Summary>
      <Baseline>
        <Number>0</Number>
        <Start>2027-01-04T08:00:00</Start>
        <Finish>2027-04-06T17:00:00</Finish>
        <Work>PT1988H0M0S</Work>
        <Cost>17718000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-01-04T08:00:00</Start>
        <Finish>2027-01-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-01-05T08:00:00</Start>
        <Finish>2027-01-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-01-06T08:00:00</Start>
        <Finish>2027-01-07T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-01-07T08:00:00</Start>
        <Finish>2027-01-08T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-01-08T08:00:00</Start>
        <Finish>2027-01-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-01-11T08:00:00</Start>
        <Finish>2027-01-12T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-01-12T08:00:00</Start>
        <Finish>2027-01-13T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-01-13T08:00:00</Start>
        <Finish>2027-01-14T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-01-14T08:00:00</Start>
        <Finish>2027-01-15T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-01-15T08:00:00</Start>
        <Finish>2027-01-16T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-01-19T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT48H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-01-19T08:00:00</Start>
        <Finish>2027-01-20T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT48H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-01-20T08:00:00</Start>
        <Finish>2027-01-21T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT48H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-01-21T08:00:00</Start>
        <Finish>2027-01-22T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT48H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-01-22T08:00:00</Start>
        <Finish>2027-01-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT48H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-01-25T08:00:00</Start>
        <Finish>2027-01-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT48H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-01-26T08:00:00</Start>
        <Finish>2027-01-27T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-01-27T08:00:00</Start>
        <Finish>2027-01-28T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-01-28T08:00:00</Start>
        <Finish>2027-01-29T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-01-29T08:00:00</Start>
        <Finish>2027-01-30T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT56H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-02-02T08:00:00</Start>
        <Finish>2027-02-03T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT56H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-02-03T08:00:00</Start>
        <Finish>2027-02-04T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT56H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-02-04T08:00:00</Start>
        <Finish>2027-02-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT48H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-02-05T08:00:00</Start>
        <Finish>2027-02-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT48H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-02-08T08:00:00</Start>
        <Finish>2027-02-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-02-09T08:00:00</Start>
        <Finish>2027-02-10T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-02-10T08:00:00</Start>
        <Finish>2027-02-11T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-02-11T08:00:00</Start>
        <Finish>2027-02-12T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-02-12T08:00:00</Start>
        <Finish>2027-02-13T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-02-15T08:00:00</Start>
        <Finish>2027-02-16T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-02-16T08:00:00</Start>
        <Finish>2027-02-17T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-02-17T08:00:00</Start>
        <Finish>2027-02-18T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-02-18T08:00:00</Start>
        <Finish>2027-02-19T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-02-19T08:00:00</Start>
        <Finish>2027-02-20T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-02-22T08:00:00</Start>
        <Finish>2027-02-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-02-23T08:00:00</Start>
        <Finish>2027-02-24T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-02-24T08:00:00</Start>
        <Finish>2027-02-25T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-02-25T08:00:00</Start>
        <Finish>2027-02-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-02-26T08:00:00</Start>
        <Finish>2027-02-27T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-03-01T08:00:00</Start>
        <Finish>2027-03-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-03-02T08:00:00</Start>
        <Finish>2027-03-03T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-03-03T08:00:00</Start>
        <Finish>2027-03-04T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT36H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-03-04T08:00:00</Start>
        <Finish>2027-03-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT36H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-03-05T08:00:00</Start>
        <Finish>2027-03-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT36H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-03-08T08:00:00</Start>
        <Finish>2027-03-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT36H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-03-09T08:00:00</Start>
        <Finish>2027-03-10T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT48H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-03-10T08:00:00</Start>
        <Finish>2027-03-11T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT48H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-03-11T08:00:00</Start>
        <Finish>2027-03-12T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-03-12T08:00:00</Start>
        <Finish>2027-03-13T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-03-15T08:00:00</Start>
        <Finish>2027-03-16T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT24H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-03-16T08:00:00</Start>
        <Finish>2027-03-17T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT24H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-03-17T08:00:00</Start>
        <Finish>2027-03-18T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT24H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-03-18T08:00:00</Start>
        <Finish>2027-03-19T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT24H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-03-19T08:00:00</Start>
        <Finish>2027-03-20T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT44H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-03-23T08:00:00</Start>
        <Finish>2027-03-24T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT44H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-03-24T08:00:00</Start>
        <Finish>2027-03-25T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-03-25T08:00:00</Start>
        <Finish>2027-03-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT24H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-03-26T08:00:00</Start>
        <Finish>2027-03-27T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT24H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-03-29T08:00:00</Start>
        <Finish>2027-03-30T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT20H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-03-30T08:00:00</Start>
        <Finish>2027-03-31T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT12H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-03-31T08:00:00</Start>
        <Finish>2027-04-01T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT12H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-04-01T08:00:00</Start>
        <Finish>2027-04-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT12H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-04-02T08:00:00</Start>
        <Finish>2027-04-03T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT12H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-04-05T08:00:00</Start>
        <Finish>2027-04-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT12H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>0</UID>
        <Start>2027-04-06T08:00:00</Start>
        <Finish>2027-04-06T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT12H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-01-04T08:00:00</Start>
        <Finish>2027-01-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>136000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-01-05T08:00:00</Start>
        <Finish>2027-01-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>136000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-01-06T08:00:00</Start>
        <Finish>2027-01-07T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>136000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-01-07T08:00:00</Start>
        <Finish>2027-01-08T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>136000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-01-08T08:00:00</Start>
        <Finish>2027-01-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>136000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-01-11T08:00:00</Start>
        <Finish>2027-01-12T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>152000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-01-12T08:00:00</Start>
        <Finish>2027-01-13T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>88000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-01-13T08:00:00</Start>
        <Finish>2027-01-14T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>88000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-01-14T08:00:00</Start>
        <Finish>2027-01-15T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>88000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-01-15T08:00:00</Start>
        <Finish>2027-01-16T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>88000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-01-19T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>436000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-01-19T08:00:00</Start>
        <Finish>2027-01-20T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>436000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-01-20T08:00:00</Start>
        <Finish>2027-01-21T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>436000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-01-21T08:00:00</Start>
        <Finish>2027-01-22T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>436000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-01-22T08:00:00</Start>
        <Finish>2027-01-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>436000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-01-25T08:00:00</Start>
        <Finish>2027-01-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>436000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-01-26T08:00:00</Start>
        <Finish>2027-01-27T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>356000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-01-27T08:00:00</Start>
        <Finish>2027-01-28T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>356000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-01-28T08:00:00</Start>
        <Finish>2027-01-29T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>356000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-01-29T08:00:00</Start>
        <Finish>2027-01-30T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>356000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>496000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-02-02T08:00:00</Start>
        <Finish>2027-02-03T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>496000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-02-03T08:00:00</Start>
        <Finish>2027-02-04T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>496000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-02-04T08:00:00</Start>
        <Finish>2027-02-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>432000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-02-05T08:00:00</Start>
        <Finish>2027-02-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>432000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-02-08T08:00:00</Start>
        <Finish>2027-02-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>356000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-02-09T08:00:00</Start>
        <Finish>2027-02-10T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>356000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-02-10T08:00:00</Start>
        <Finish>2027-02-11T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-02-11T08:00:00</Start>
        <Finish>2027-02-12T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-02-12T08:00:00</Start>
        <Finish>2027-02-13T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-02-15T08:00:00</Start>
        <Finish>2027-02-16T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-02-16T08:00:00</Start>
        <Finish>2027-02-17T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-02-17T08:00:00</Start>
        <Finish>2027-02-18T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-02-18T08:00:00</Start>
        <Finish>2027-02-19T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-02-19T08:00:00</Start>
        <Finish>2027-02-20T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-02-22T08:00:00</Start>
        <Finish>2027-02-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-02-23T08:00:00</Start>
        <Finish>2027-02-24T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-02-24T08:00:00</Start>
        <Finish>2027-02-25T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-02-25T08:00:00</Start>
        <Finish>2027-02-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>72000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-02-26T08:00:00</Start>
        <Finish>2027-02-27T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>72000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-03-01T08:00:00</Start>
        <Finish>2027-03-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>72000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-03-02T08:00:00</Start>
        <Finish>2027-03-03T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>72000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-03-03T08:00:00</Start>
        <Finish>2027-03-04T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>282000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-03-04T08:00:00</Start>
        <Finish>2027-03-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>282000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-03-05T08:00:00</Start>
        <Finish>2027-03-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>282000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-03-08T08:00:00</Start>
        <Finish>2027-03-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>282000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-03-09T08:00:00</Start>
        <Finish>2027-03-10T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>396000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-03-10T08:00:00</Start>
        <Finish>2027-03-11T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>396000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-03-11T08:00:00</Start>
        <Finish>2027-03-12T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>344000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-03-12T08:00:00</Start>
        <Finish>2027-03-13T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>344000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-03-15T08:00:00</Start>
        <Finish>2027-03-16T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>224000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-03-16T08:00:00</Start>
        <Finish>2027-03-17T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>224000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-03-17T08:00:00</Start>
        <Finish>2027-03-18T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>224000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-03-18T08:00:00</Start>
        <Finish>2027-03-19T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>224000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-03-19T08:00:00</Start>
        <Finish>2027-03-20T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>80000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>372000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-03-23T08:00:00</Start>
        <Finish>2027-03-24T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>372000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-03-24T08:00:00</Start>
        <Finish>2027-03-25T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>248000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-03-25T08:00:00</Start>
        <Finish>2027-03-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>204000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-03-26T08:00:00</Start>
        <Finish>2027-03-27T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>204000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-03-29T08:00:00</Start>
        <Finish>2027-03-30T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>196000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-03-30T08:00:00</Start>
        <Finish>2027-03-31T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>116000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-03-31T08:00:00</Start>
        <Finish>2027-04-01T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>118000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-04-01T08:00:00</Start>
        <Finish>2027-04-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>118000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-04-02T08:00:00</Start>
        <Finish>2027-04-03T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>118000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-04-05T08:00:00</Start>
        <Finish>2027-04-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>118000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>0</UID>
        <Start>2027-04-06T08:00:00</Start>
        <Finish>2027-04-06T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>118000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>1</UID>
      <ID>1</ID>
      <Name>Discovery</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>1</OutlineNumber>
      <OutlineLevel>1</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-01-04T08:00:00</Start>
      <Finish>2027-01-15T17:00:00</Finish>
      <Duration>PT80H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>1</Summary>
      <Critical>0</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>100</PercentComplete>
      <Cost>1184000</Cost>
      <ActualCost>1184000</ActualCost>
      <ConstraintType>0</ConstraintType>
      <Baseline>
        <Number>0</Number>
        <Start>2027-01-04T08:00:00</Start>
        <Finish>2027-01-15T17:00:00</Finish>
        <Duration>PT80H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT128H0M0S</Work>
        <Cost>1184000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>1</UID>
        <Start>2027-01-04T08:00:00</Start>
        <Finish>2027-01-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>1</UID>
        <Start>2027-01-05T08:00:00</Start>
        <Finish>2027-01-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>1</UID>
        <Start>2027-01-06T08:00:00</Start>
        <Finish>2027-01-07T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>1</UID>
        <Start>2027-01-07T08:00:00</Start>
        <Finish>2027-01-08T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>1</UID>
        <Start>2027-01-08T08:00:00</Start>
        <Finish>2027-01-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>1</UID>
        <Start>2027-01-11T08:00:00</Start>
        <Finish>2027-01-12T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>1</UID>
        <Start>2027-01-12T08:00:00</Start>
        <Finish>2027-01-13T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>1</UID>
        <Start>2027-01-13T08:00:00</Start>
        <Finish>2027-01-14T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>1</UID>
        <Start>2027-01-14T08:00:00</Start>
        <Finish>2027-01-15T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>1</UID>
        <Start>2027-01-15T08:00:00</Start>
        <Finish>2027-01-15T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>1</UID>
        <Start>2027-01-04T08:00:00</Start>
        <Finish>2027-01-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>136000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>1</UID>
        <Start>2027-01-05T08:00:00</Start>
        <Finish>2027-01-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>136000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>1</UID>
        <Start>2027-01-06T08:00:00</Start>
        <Finish>2027-01-07T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>136000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>1</UID>
        <Start>2027-01-07T08:00:00</Start>
        <Finish>2027-01-08T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>136000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>1</UID>
        <Start>2027-01-08T08:00:00</Start>
        <Finish>2027-01-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>136000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>1</UID>
        <Start>2027-01-11T08:00:00</Start>
        <Finish>2027-01-12T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>152000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>1</UID>
        <Start>2027-01-12T08:00:00</Start>
        <Finish>2027-01-13T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>88000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>1</UID>
        <Start>2027-01-13T08:00:00</Start>
        <Finish>2027-01-14T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>88000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>1</UID>
        <Start>2027-01-14T08:00:00</Start>
        <Finish>2027-01-15T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>88000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>1</UID>
        <Start>2027-01-15T08:00:00</Start>
        <Finish>2027-01-15T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>88000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>2</UID>
      <ID>2</ID>
      <Name>Release kickoff</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>1.1</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-01-04T08:00:00</Start>
      <Finish>2027-01-04T08:00:00</Finish>
      <Duration>PT0H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Estimated>0</Estimated>
      <Milestone>1</Milestone>
      <Summary>0</Summary>
      <Critical>0</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>100</PercentComplete>
      <ActualStart>2027-01-04T08:00:00</ActualStart>
      <ActualFinish>2027-01-04T08:00:00</ActualFinish>
      <ConstraintType>0</ConstraintType>
      <Baseline>
        <Number>0</Number>
        <Start>2027-01-04T08:00:00</Start>
        <Finish>2027-01-04T08:00:00</Finish>
        <Duration>PT0H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
      </Baseline>
    </Task>
    <Task>
      <UID>3</UID>
      <ID>3</ID>
      <Name>Requirements</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>1.2</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-01-04T08:00:00</Start>
      <Finish>2027-01-15T17:00:00</Finish>
      <Duration>PT80H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>1</Summary>
      <Critical>0</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>100</PercentComplete>
      <Cost>1184000</Cost>
      <ActualCost>1184000</ActualCost>
      <ConstraintType>0</ConstraintType>
      <Baseline>
        <Number>0</Number>
        <Start>2027-01-04T08:00:00</Start>
        <Finish>2027-01-15T17:00:00</Finish>
        <Duration>PT80H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT128H0M0S</Work>
        <Cost>1184000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>3</UID>
        <Start>2027-01-04T08:00:00</Start>
        <Finish>2027-01-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>3</UID>
        <Start>2027-01-05T08:00:00</Start>
        <Finish>2027-01-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>3</UID>
        <Start>2027-01-06T08:00:00</Start>
        <Finish>2027-01-07T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>3</UID>
        <Start>2027-01-07T08:00:00</Start>
        <Finish>2027-01-08T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>3</UID>
        <Start>2027-01-08T08:00:00</Start>
        <Finish>2027-01-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>3</UID>
        <Start>2027-01-11T08:00:00</Start>
        <Finish>2027-01-12T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>3</UID>
        <Start>2027-01-12T08:00:00</Start>
        <Finish>2027-01-13T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>3</UID>
        <Start>2027-01-13T08:00:00</Start>
        <Finish>2027-01-14T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>3</UID>
        <Start>2027-01-14T08:00:00</Start>
        <Finish>2027-01-15T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>3</UID>
        <Start>2027-01-15T08:00:00</Start>
        <Finish>2027-01-15T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>3</UID>
        <Start>2027-01-04T08:00:00</Start>
        <Finish>2027-01-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>136000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>3</UID>
        <Start>2027-01-05T08:00:00</Start>
        <Finish>2027-01-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>136000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>3</UID>
        <Start>2027-01-06T08:00:00</Start>
        <Finish>2027-01-07T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>136000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>3</UID>
        <Start>2027-01-07T08:00:00</Start>
        <Finish>2027-01-08T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>136000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>3</UID>
        <Start>2027-01-08T08:00:00</Start>
        <Finish>2027-01-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>136000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>3</UID>
        <Start>2027-01-11T08:00:00</Start>
        <Finish>2027-01-12T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>152000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>3</UID>
        <Start>2027-01-12T08:00:00</Start>
        <Finish>2027-01-13T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>88000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>3</UID>
        <Start>2027-01-13T08:00:00</Start>
        <Finish>2027-01-14T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>88000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>3</UID>
        <Start>2027-01-14T08:00:00</Start>
        <Finish>2027-01-15T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>88000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>3</UID>
        <Start>2027-01-15T08:00:00</Start>
        <Finish>2027-01-15T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>88000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>4</UID>
      <ID>4</ID>
      <Name>Product requirements document</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>1.2.1</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-01-04T08:00:00</Start>
      <Finish>2027-01-08T17:00:00</Finish>
      <Duration>PT40H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT40H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>0</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>100</PercentComplete>
      <PercentWorkComplete>100</PercentWorkComplete>
      <Cost>360000</Cost>
      <ActualStart>2027-01-04T08:00:00</ActualStart>
      <ActualFinish>2027-01-08T17:00:00</ActualFinish>
      <ActualCost>360000</ActualCost>
      <ActualWork>PT40H0M0S</ActualWork>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>2</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-01-04T08:00:00</Start>
        <Finish>2027-01-08T17:00:00</Finish>
        <Duration>PT40H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT40H0M0S</Work>
        <Cost>360000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>4</UID>
        <Start>2027-01-04T08:00:00</Start>
        <Finish>2027-01-08T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>4</UID>
        <Start>2027-01-04T08:00:00</Start>
        <Finish>2027-01-08T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>360000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>5</UID>
      <ID>5</ID>
      <Name>UX research and wireframes</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>1.2.2</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-01-04T08:00:00</Start>
      <Finish>2027-01-11T17:00:00</Finish>
      <Duration>PT48H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT48H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>0</Critical>
      <TotalSlack>19200</TotalSlack>
      <PercentComplete>100</PercentComplete>
      <PercentWorkComplete>100</PercentWorkComplete>
      <Cost>384000</Cost>
      <ActualStart>2027-01-04T08:00:00</ActualStart>
      <ActualFinish>2027-01-11T17:00:00</ActualFinish>
      <ActualCost>384000</ActualCost>
      <ActualWork>PT48H0M0S</ActualWork>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>2</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-01-04T08:00:00</Start>
        <Finish>2027-01-11T17:00:00</Finish>
        <Duration>PT48H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT48H0M0S</Work>
        <Cost>384000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>5</UID>
        <Start>2027-01-04T08:00:00</Start>
        <Finish>2027-01-11T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT48H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>5</UID>
        <Start>2027-01-04T08:00:00</Start>
        <Finish>2027-01-11T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>384000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>6</UID>
      <ID>6</ID>
      <Name>Architecture and technical design</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>1.2.3</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-01-11T08:00:00</Start>
      <Finish>2027-01-15T17:00:00</Finish>
      <Duration>PT40H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT40H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>0</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>100</PercentComplete>
      <PercentWorkComplete>100</PercentWorkComplete>
      <Cost>440000</Cost>
      <ActualStart>2027-01-11T08:00:00</ActualStart>
      <ActualFinish>2027-01-15T17:00:00</ActualFinish>
      <ActualCost>440000</ActualCost>
      <ActualWork>PT40H0M0S</ActualWork>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>4</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-01-11T08:00:00</Start>
        <Finish>2027-01-15T17:00:00</Finish>
        <Duration>PT40H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT40H0M0S</Work>
        <Cost>440000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>6</UID>
        <Start>2027-01-11T08:00:00</Start>
        <Finish>2027-01-15T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>6</UID>
        <Start>2027-01-11T08:00:00</Start>
        <Finish>2027-01-15T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>440000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>7</UID>
      <ID>7</ID>
      <Name>Scope signed off</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>1.3</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-01-15T17:00:00</Start>
      <Finish>2027-01-15T17:00:00</Finish>
      <Duration>PT0H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Estimated>0</Estimated>
      <Milestone>1</Milestone>
      <Summary>0</Summary>
      <Critical>0</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>100</PercentComplete>
      <ActualStart>2027-01-15T17:00:00</ActualStart>
      <ActualFinish>2027-01-15T17:00:00</ActualFinish>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>6</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <PredecessorLink>
        <PredecessorUID>5</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-01-15T17:00:00</Start>
        <Finish>2027-01-15T17:00:00</Finish>
        <Duration>PT0H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
      </Baseline>
    </Task>
    <Task>
      <UID>8</UID>
      <ID>8</ID>
      <Name>Build</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>2</OutlineNumber>
      <OutlineLevel>1</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-01-18T08:00:00</Start>
      <Finish>2027-03-02T17:00:00</Finish>
      <Duration>PT256H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>1</Summary>
      <Critical>1</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>75</PercentComplete>
      <Cost>10084000</Cost>
      <ActualCost>7577617</ActualCost>
      <ConstraintType>0</ConstraintType>
      <Baseline>
        <Number>0</Number>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-03-02T17:00:00</Finish>
        <Duration>PT256H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT1040H0M0S</Work>
        <Cost>9628000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-01-19T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-01-19T08:00:00</Start>
        <Finish>2027-01-20T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-01-20T08:00:00</Start>
        <Finish>2027-01-21T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-01-21T08:00:00</Start>
        <Finish>2027-01-22T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-01-22T08:00:00</Start>
        <Finish>2027-01-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-01-25T08:00:00</Start>
        <Finish>2027-01-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-01-26T08:00:00</Start>
        <Finish>2027-01-27T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-01-27T08:00:00</Start>
        <Finish>2027-01-28T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-01-28T08:00:00</Start>
        <Finish>2027-01-29T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-01-29T08:00:00</Start>
        <Finish>2027-01-30T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT48H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-02-02T08:00:00</Start>
        <Finish>2027-02-03T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT48H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-02-03T08:00:00</Start>
        <Finish>2027-02-04T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT48H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-02-04T08:00:00</Start>
        <Finish>2027-02-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-02-05T08:00:00</Start>
        <Finish>2027-02-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-02-08T08:00:00</Start>
        <Finish>2027-02-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-02-09T08:00:00</Start>
        <Finish>2027-02-10T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-02-10T08:00:00</Start>
        <Finish>2027-02-11T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-02-11T08:00:00</Start>
        <Finish>2027-02-12T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-02-12T08:00:00</Start>
        <Finish>2027-02-13T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-02-15T08:00:00</Start>
        <Finish>2027-02-16T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-02-16T08:00:00</Start>
        <Finish>2027-02-17T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-02-17T08:00:00</Start>
        <Finish>2027-02-18T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-02-18T08:00:00</Start>
        <Finish>2027-02-19T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-02-19T08:00:00</Start>
        <Finish>2027-02-20T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-02-22T08:00:00</Start>
        <Finish>2027-02-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-02-23T08:00:00</Start>
        <Finish>2027-02-24T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-02-24T08:00:00</Start>
        <Finish>2027-02-25T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-02-25T08:00:00</Start>
        <Finish>2027-02-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-02-26T08:00:00</Start>
        <Finish>2027-02-27T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-03-01T08:00:00</Start>
        <Finish>2027-03-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>8</UID>
        <Start>2027-03-02T08:00:00</Start>
        <Finish>2027-03-02T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-01-19T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>376000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-01-19T08:00:00</Start>
        <Finish>2027-01-20T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>376000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-01-20T08:00:00</Start>
        <Finish>2027-01-21T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>376000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-01-21T08:00:00</Start>
        <Finish>2027-01-22T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>376000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-01-22T08:00:00</Start>
        <Finish>2027-01-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>376000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-01-25T08:00:00</Start>
        <Finish>2027-01-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>376000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-01-26T08:00:00</Start>
        <Finish>2027-01-27T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-01-27T08:00:00</Start>
        <Finish>2027-01-28T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-01-28T08:00:00</Start>
        <Finish>2027-01-29T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-01-29T08:00:00</Start>
        <Finish>2027-01-30T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>436000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-02-02T08:00:00</Start>
        <Finish>2027-02-03T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>436000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-02-03T08:00:00</Start>
        <Finish>2027-02-04T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>436000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-02-04T08:00:00</Start>
        <Finish>2027-02-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>372000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-02-05T08:00:00</Start>
        <Finish>2027-02-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>372000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-02-08T08:00:00</Start>
        <Finish>2027-02-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-02-09T08:00:00</Start>
        <Finish>2027-02-10T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-02-10T08:00:00</Start>
        <Finish>2027-02-11T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-02-11T08:00:00</Start>
        <Finish>2027-02-12T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-02-12T08:00:00</Start>
        <Finish>2027-02-13T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-02-15T08:00:00</Start>
        <Finish>2027-02-16T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-02-16T08:00:00</Start>
        <Finish>2027-02-17T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-02-17T08:00:00</Start>
        <Finish>2027-02-18T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-02-18T08:00:00</Start>
        <Finish>2027-02-19T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-02-19T08:00:00</Start>
        <Finish>2027-02-20T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-02-22T08:00:00</Start>
        <Finish>2027-02-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-02-23T08:00:00</Start>
        <Finish>2027-02-24T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-02-24T08:00:00</Start>
        <Finish>2027-02-25T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-02-25T08:00:00</Start>
        <Finish>2027-02-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>72000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-02-26T08:00:00</Start>
        <Finish>2027-02-27T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>72000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-03-01T08:00:00</Start>
        <Finish>2027-03-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>72000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>8</UID>
        <Start>2027-03-02T08:00:00</Start>
        <Finish>2027-03-02T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>72000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>9</UID>
      <ID>9</ID>
      <Name>Sprint 1</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>2.1</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-01-18T08:00:00</Start>
      <Finish>2027-02-03T17:00:00</Finish>
      <Duration>PT104H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>1</Summary>
      <Critical>0</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>100</PercentComplete>
      <Cost>3632000</Cost>
      <ActualCost>3632000</ActualCost>
      <ConstraintType>0</ConstraintType>
      <Baseline>
        <Number>0</Number>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-02-03T17:00:00</Finish>
        <Duration>PT104H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT392H0M0S</Work>
        <Cost>3632000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>9</UID>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-01-19T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>9</UID>
        <Start>2027-01-19T08:00:00</Start>
        <Finish>2027-01-20T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>9</UID>
        <Start>2027-01-20T08:00:00</Start>
        <Finish>2027-01-21T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>9</UID>
        <Start>2027-01-21T08:00:00</Start>
        <Finish>2027-01-22T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>9</UID>
        <Start>2027-01-22T08:00:00</Start>
        <Finish>2027-01-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>9</UID>
        <Start>2027-01-25T08:00:00</Start>
        <Finish>2027-01-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>9</UID>
        <Start>2027-01-26T08:00:00</Start>
        <Finish>2027-01-27T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>9</UID>
        <Start>2027-01-27T08:00:00</Start>
        <Finish>2027-01-28T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>9</UID>
        <Start>2027-01-28T08:00:00</Start>
        <Finish>2027-01-29T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>9</UID>
        <Start>2027-01-29T08:00:00</Start>
        <Finish>2027-01-30T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>9</UID>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>9</UID>
        <Start>2027-02-02T08:00:00</Start>
        <Finish>2027-02-03T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>9</UID>
        <Start>2027-02-03T08:00:00</Start>
        <Finish>2027-02-03T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>9</UID>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-01-19T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>376000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>9</UID>
        <Start>2027-01-19T08:00:00</Start>
        <Finish>2027-01-20T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>376000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>9</UID>
        <Start>2027-01-20T08:00:00</Start>
        <Finish>2027-01-21T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>376000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>9</UID>
        <Start>2027-01-21T08:00:00</Start>
        <Finish>2027-01-22T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>376000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>9</UID>
        <Start>2027-01-22T08:00:00</Start>
        <Finish>2027-01-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>376000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>9</UID>
        <Start>2027-01-25T08:00:00</Start>
        <Finish>2027-01-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>376000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>9</UID>
        <Start>2027-01-26T08:00:00</Start>
        <Finish>2027-01-27T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>9</UID>
        <Start>2027-01-27T08:00:00</Start>
        <Finish>2027-01-28T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>9</UID>
        <Start>2027-01-28T08:00:00</Start>
        <Finish>2027-01-29T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>9</UID>
        <Start>2027-01-29T08:00:00</Start>
        <Finish>2027-01-30T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>9</UID>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>64000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>9</UID>
        <Start>2027-02-02T08:00:00</Start>
        <Finish>2027-02-03T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>64000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>9</UID>
        <Start>2027-02-03T08:00:00</Start>
        <Finish>2027-02-03T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>64000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>10</UID>
      <ID>10</ID>
      <Name>API: accounts and billing endpoints</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>2.1.1</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-01-18T08:00:00</Start>
      <Finish>2027-01-29T17:00:00</Finish>
      <Duration>PT80H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT160H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>0</Critical>
      <TotalSlack>4800</TotalSlack>
      <PercentComplete>100</PercentComplete>
      <PercentWorkComplete>100</PercentWorkComplete>
      <Cost>1520000</Cost>
      <ActualStart>2027-01-18T08:00:00</ActualStart>
      <ActualFinish>2027-01-29T17:00:00</ActualFinish>
      <ActualCost>1520000</ActualCost>
      <ActualWork>PT160H0M0S</ActualWork>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>7</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-01-29T17:00:00</Finish>
        <Duration>PT80H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT160H0M0S</Work>
        <Cost>1520000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>10</UID>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-01-29T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT160H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>10</UID>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-01-29T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>1520000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>11</UID>
      <ID>11</ID>
      <Name>UI: new dashboard</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>2.1.2</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-01-18T08:00:00</Start>
      <Finish>2027-01-29T17:00:00</Finish>
      <Duration>PT80H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT160H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>0</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>100</PercentComplete>
      <PercentWorkComplete>100</PercentWorkComplete>
      <Cost>1440000</Cost>
      <ActualStart>2027-01-18T08:00:00</ActualStart>
      <ActualFinish>2027-01-29T17:00:00</ActualFinish>
      <ActualCost>1440000</ActualCost>
      <ActualWork>PT160H0M0S</ActualWork>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>7</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-01-29T17:00:00</Finish>
        <Duration>PT80H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT160H0M0S</Work>
        <Cost>1440000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>11</UID>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-01-29T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT160H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>11</UID>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-01-29T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>1440000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>12</UID>
      <ID>12</ID>
      <Name>Infrastructure as code for new services</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>2.1.3</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-01-18T08:00:00</Start>
      <Finish>2027-01-25T17:00:00</Finish>
      <Duration>PT48H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT48H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>0</Critical>
      <TotalSlack>72000</TotalSlack>
      <PercentComplete>100</PercentComplete>
      <PercentWorkComplete>100</PercentWorkComplete>
      <Cost>480000</Cost>
      <ActualStart>2027-01-18T08:00:00</ActualStart>
      <ActualFinish>2027-01-25T17:00:00</ActualFinish>
      <ActualCost>480000</ActualCost>
      <ActualWork>PT48H0M0S</ActualWork>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>7</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-01-25T17:00:00</Finish>
        <Duration>PT48H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT48H0M0S</Work>
        <Cost>480000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>12</UID>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-01-25T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT48H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>12</UID>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-01-25T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>480000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>13</UID>
      <ID>13</ID>
      <Name>Design review and usability test</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>2.1.4</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-02-01T08:00:00</Start>
      <Finish>2027-02-03T17:00:00</Finish>
      <Duration>PT24H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT24H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>0</Critical>
      <TotalSlack>33600</TotalSlack>
      <PercentComplete>100</PercentComplete>
      <PercentWorkComplete>100</PercentWorkComplete>
      <Cost>192000</Cost>
      <ActualStart>2027-02-01T08:00:00</ActualStart>
      <ActualFinish>2027-02-03T17:00:00</ActualFinish>
      <ActualCost>192000</ActualCost>
      <ActualWork>PT24H0M0S</ActualWork>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>11</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-03T17:00:00</Finish>
        <Duration>PT24H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT24H0M0S</Work>
        <Cost>192000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>13</UID>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-03T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT24H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>13</UID>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-03T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>192000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>14</UID>
      <ID>14</ID>
      <Name>Sprint 2</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>2.2</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-02-01T08:00:00</Start>
      <Finish>2027-02-12T17:00:00</Finish>
      <Duration>PT80H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>1</Summary>
      <Critical>0</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>100</PercentComplete>
      <Cost>3340000</Cost>
      <ActualCost>3340000</ActualCost>
      <ConstraintType>0</ConstraintType>
      <Baseline>
        <Number>0</Number>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-12T17:00:00</Finish>
        <Duration>PT80H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT360H0M0S</Work>
        <Cost>3340000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>14</UID>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>14</UID>
        <Start>2027-02-02T08:00:00</Start>
        <Finish>2027-02-03T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>14</UID>
        <Start>2027-02-03T08:00:00</Start>
        <Finish>2027-02-04T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>14</UID>
        <Start>2027-02-04T08:00:00</Start>
        <Finish>2027-02-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>14</UID>
        <Start>2027-02-05T08:00:00</Start>
        <Finish>2027-02-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>14</UID>
        <Start>2027-02-08T08:00:00</Start>
        <Finish>2027-02-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>14</UID>
        <Start>2027-02-09T08:00:00</Start>
        <Finish>2027-02-10T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>14</UID>
        <Start>2027-02-10T08:00:00</Start>
        <Finish>2027-02-11T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>14</UID>
        <Start>2027-02-11T08:00:00</Start>
        <Finish>2027-02-12T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>14</UID>
        <Start>2027-02-12T08:00:00</Start>
        <Finish>2027-02-12T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>14</UID>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>372000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>14</UID>
        <Start>2027-02-02T08:00:00</Start>
        <Finish>2027-02-03T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>372000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>14</UID>
        <Start>2027-02-03T08:00:00</Start>
        <Finish>2027-02-04T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>372000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>14</UID>
        <Start>2027-02-04T08:00:00</Start>
        <Finish>2027-02-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>372000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>14</UID>
        <Start>2027-02-05T08:00:00</Start>
        <Finish>2027-02-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>372000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>14</UID>
        <Start>2027-02-08T08:00:00</Start>
        <Finish>2027-02-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>14</UID>
        <Start>2027-02-09T08:00:00</Start>
        <Finish>2027-02-10T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>14</UID>
        <Start>2027-02-10T08:00:00</Start>
        <Finish>2027-02-11T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>14</UID>
        <Start>2027-02-11T08:00:00</Start>
        <Finish>2027-02-12T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>14</UID>
        <Start>2027-02-12T08:00:00</Start>
        <Finish>2027-02-12T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>15</UID>
      <ID>15</ID>
      <Name>API: reporting endpoints</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>2.2.1</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-02-01T08:00:00</Start>
      <Finish>2027-02-12T17:00:00</Finish>
      <Duration>PT80H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT160H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>0</Critical>
      <TotalSlack>4800</TotalSlack>
      <PercentComplete>100</PercentComplete>
      <PercentWorkComplete>100</PercentWorkComplete>
      <Cost>1520000</Cost>
      <ActualStart>2027-02-01T08:00:00</ActualStart>
      <ActualFinish>2027-02-12T17:00:00</ActualFinish>
      <ActualCost>1520000</ActualCost>
      <ActualWork>PT160H0M0S</ActualWork>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>10</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-12T17:00:00</Finish>
        <Duration>PT80H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT160H0M0S</Work>
        <Cost>1520000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>15</UID>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-12T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT160H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>15</UID>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-12T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>1520000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>16</UID>
      <ID>16</ID>
      <Name>UI: reports and exports</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>2.2.2</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-02-01T08:00:00</Start>
      <Finish>2027-02-12T17:00:00</Finish>
      <Duration>PT80H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT160H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>0</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>100</PercentComplete>
      <PercentWorkComplete>100</PercentWorkComplete>
      <Cost>1440000</Cost>
      <ActualStart>2027-02-01T08:00:00</ActualStart>
      <ActualFinish>2027-02-12T17:00:00</ActualFinish>
      <ActualCost>1440000</ActualCost>
      <ActualWork>PT160H0M0S</ActualWork>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>11</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-12T17:00:00</Finish>
        <Duration>PT80H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT160H0M0S</Work>
        <Cost>1440000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>16</UID>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-12T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT160H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>16</UID>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-12T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>1440000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>17</UID>
      <ID>17</ID>
      <Name>Database migration scripts</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>2.2.3</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-02-01T08:00:00</Start>
      <Finish>2027-02-05T17:00:00</Finish>
      <Duration>PT40H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT40H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>0</Critical>
      <TotalSlack>81600</TotalSlack>
      <PercentComplete>100</PercentComplete>
      <PercentWorkComplete>100</PercentWorkComplete>
      <Cost>380000</Cost>
      <ActualStart>2027-02-01T08:00:00</ActualStart>
      <ActualFinish>2027-02-05T17:00:00</ActualFinish>
      <ActualCost>380000</ActualCost>
      <ActualWork>PT40H0M0S</ActualWork>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>10</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-05T17:00:00</Finish>
        <Duration>PT40H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT40H0M0S</Work>
        <Cost>380000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>17</UID>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-05T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>17</UID>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-05T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>380000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>18</UID>
      <ID>18</ID>
      <Name>Sprint 3</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>2.3</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-02-15T08:00:00</Start>
      <Finish>2027-03-02T17:00:00</Finish>
      <Duration>PT96H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>1</Summary>
      <Critical>1</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>18</PercentComplete>
      <Cost>3112000</Cost>
      <ActualCost>605617</ActualCost>
      <ConstraintType>0</ConstraintType>
      <Baseline>
        <Number>0</Number>
        <Start>2027-02-15T08:00:00</Start>
        <Finish>2027-03-02T17:00:00</Finish>
        <Duration>PT96H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT288H0M0S</Work>
        <Cost>2656000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>18</UID>
        <Start>2027-02-15T08:00:00</Start>
        <Finish>2027-02-16T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>18</UID>
        <Start>2027-02-16T08:00:00</Start>
        <Finish>2027-02-17T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>18</UID>
        <Start>2027-02-17T08:00:00</Start>
        <Finish>2027-02-18T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>18</UID>
        <Start>2027-02-18T08:00:00</Start>
        <Finish>2027-02-19T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>18</UID>
        <Start>2027-02-19T08:00:00</Start>
        <Finish>2027-02-20T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>18</UID>
        <Start>2027-02-22T08:00:00</Start>
        <Finish>2027-02-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>18</UID>
        <Start>2027-02-23T08:00:00</Start>
        <Finish>2027-02-24T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>18</UID>
        <Start>2027-02-24T08:00:00</Start>
        <Finish>2027-02-25T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>18</UID>
        <Start>2027-02-25T08:00:00</Start>
        <Finish>2027-02-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>18</UID>
        <Start>2027-02-26T08:00:00</Start>
        <Finish>2027-02-27T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>18</UID>
        <Start>2027-03-01T08:00:00</Start>
        <Finish>2027-03-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>18</UID>
        <Start>2027-03-02T08:00:00</Start>
        <Finish>2027-03-02T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>18</UID>
        <Start>2027-02-15T08:00:00</Start>
        <Finish>2027-02-16T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>18</UID>
        <Start>2027-02-16T08:00:00</Start>
        <Finish>2027-02-17T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>18</UID>
        <Start>2027-02-17T08:00:00</Start>
        <Finish>2027-02-18T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>18</UID>
        <Start>2027-02-18T08:00:00</Start>
        <Finish>2027-02-19T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>18</UID>
        <Start>2027-02-19T08:00:00</Start>
        <Finish>2027-02-20T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>18</UID>
        <Start>2027-02-22T08:00:00</Start>
        <Finish>2027-02-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>18</UID>
        <Start>2027-02-23T08:00:00</Start>
        <Finish>2027-02-24T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>18</UID>
        <Start>2027-02-24T08:00:00</Start>
        <Finish>2027-02-25T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>296000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>18</UID>
        <Start>2027-02-25T08:00:00</Start>
        <Finish>2027-02-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>72000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>18</UID>
        <Start>2027-02-26T08:00:00</Start>
        <Finish>2027-02-27T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>72000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>18</UID>
        <Start>2027-03-01T08:00:00</Start>
        <Finish>2027-03-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>72000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>18</UID>
        <Start>2027-03-02T08:00:00</Start>
        <Finish>2027-03-02T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>72000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>19</UID>
      <ID>19</ID>
      <Name>Integrations: webhooks and single sign-on</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>2.3.1</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-02-15T08:00:00</Start>
      <Finish>2027-03-01T17:00:00</Finish>
      <Duration>PT88H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT176H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>0</Critical>
      <TotalSlack>4800</TotalSlack>
      <PercentComplete>19</PercentComplete>
      <PercentWorkComplete>19</PercentWorkComplete>
      <Cost>1672000</Cost>
      <ActualStart>2027-02-15T08:00:00</ActualStart>
      <ActualCost>317617</ActualCost>
      <ActualWork>PT33H26M0S</ActualWork>
      <RemainingWork>PT142H34M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>15</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <PredecessorLink>
        <PredecessorUID>12</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-02-15T08:00:00</Start>
        <Finish>2027-02-24T17:00:00</Finish>
        <Duration>PT64H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT128H0M0S</Work>
        <Cost>1216000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>19</UID>
        <Start>2027-02-15T08:00:00</Start>
        <Finish>2027-02-24T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT128H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>19</UID>
        <Start>2027-02-15T08:00:00</Start>
        <Finish>2027-02-24T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>1216000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>20</UID>
      <ID>20</ID>
      <Name>UI: settings and onboarding</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>2.3.2</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-02-15T08:00:00</Start>
      <Finish>2027-02-24T17:00:00</Finish>
      <Duration>PT64H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT128H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>1</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>25</PercentComplete>
      <PercentWorkComplete>25</PercentWorkComplete>
      <Cost>1152000</Cost>
      <ActualStart>2027-02-15T08:00:00</ActualStart>
      <ActualCost>288000</ActualCost>
      <ActualWork>PT32H0M0S</ActualWork>
      <RemainingWork>PT96H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>16</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <PredecessorLink>
        <PredecessorUID>13</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-02-15T08:00:00</Start>
        <Finish>2027-02-24T17:00:00</Finish>
        <Duration>PT64H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT128H0M0S</Work>
        <Cost>1152000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>20</UID>
        <Start>2027-02-15T08:00:00</Start>
        <Finish>2027-02-24T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT128H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>20</UID>
        <Start>2027-02-15T08:00:00</Start>
        <Finish>2027-02-24T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>1152000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>21</UID>
      <ID>21</ID>
      <Name>Accessibility fixes</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>2.3.3</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-02-25T08:00:00</Start>
      <Finish>2027-03-02T17:00:00</Finish>
      <Duration>PT32H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT32H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>1</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>288000</Cost>
      <ActualCost>0</ActualCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <RemainingWork>PT32H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>20</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <ExtendedAttribute>
        <FieldID>188743783</FieldID>
        <Value>PT24H0M0S</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743785</FieldID>
        <Value>PT52H0M0S</Value>
      </ExtendedAttribute>
      <Baseline>
        <Number>0</Number>
        <Start>2027-02-25T08:00:00</Start>
        <Finish>2027-03-02T17:00:00</Finish>
        <Duration>PT32H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT32H0M0S</Work>
        <Cost>288000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>21</UID>
        <Start>2027-02-25T08:00:00</Start>
        <Finish>2027-03-02T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT32H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>21</UID>
        <Start>2027-02-25T08:00:00</Start>
        <Finish>2027-03-02T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>288000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>22</UID>
      <ID>22</ID>
      <Name>Feature complete</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>2.4</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-03-02T17:00:00</Start>
      <Finish>2027-03-02T17:00:00</Finish>
      <Duration>PT0H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Estimated>0</Estimated>
      <Milestone>1</Milestone>
      <Summary>0</Summary>
      <Critical>1</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>0</PercentComplete>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>19</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <PredecessorLink>
        <PredecessorUID>21</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <PredecessorLink>
        <PredecessorUID>17</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-03-02T17:00:00</Start>
        <Finish>2027-03-02T17:00:00</Finish>
        <Duration>PT0H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
      </Baseline>
    </Task>
    <Task>
      <UID>23</UID>
      <ID>23</ID>
      <Name>Quality</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>3</OutlineNumber>
      <OutlineLevel>1</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-01-18T08:00:00</Start>
      <Finish>2027-03-26T17:00:00</Finish>
      <Duration>PT400H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>1</Summary>
      <Critical>1</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>35</PercentComplete>
      <Cost>4952000</Cost>
      <ActualCost>1020000</ActualCost>
      <ConstraintType>0</ConstraintType>
      <Baseline>
        <Number>0</Number>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-03-26T17:00:00</Finish>
        <Duration>PT400H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT592H0M0S</Work>
        <Cost>4952000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-01-19T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-01-19T08:00:00</Start>
        <Finish>2027-01-20T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-01-20T08:00:00</Start>
        <Finish>2027-01-21T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-01-21T08:00:00</Start>
        <Finish>2027-01-22T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-01-22T08:00:00</Start>
        <Finish>2027-01-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-01-25T08:00:00</Start>
        <Finish>2027-01-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-01-26T08:00:00</Start>
        <Finish>2027-01-27T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-01-27T08:00:00</Start>
        <Finish>2027-01-28T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-01-28T08:00:00</Start>
        <Finish>2027-01-29T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-01-29T08:00:00</Start>
        <Finish>2027-01-30T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-02-02T08:00:00</Start>
        <Finish>2027-02-03T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-02-03T08:00:00</Start>
        <Finish>2027-02-04T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-02-04T08:00:00</Start>
        <Finish>2027-02-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-02-05T08:00:00</Start>
        <Finish>2027-02-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-02-08T08:00:00</Start>
        <Finish>2027-02-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-02-09T08:00:00</Start>
        <Finish>2027-02-10T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-03-03T08:00:00</Start>
        <Finish>2027-03-04T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT28H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-03-04T08:00:00</Start>
        <Finish>2027-03-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT28H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-03-05T08:00:00</Start>
        <Finish>2027-03-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT28H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-03-08T08:00:00</Start>
        <Finish>2027-03-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT28H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-03-09T08:00:00</Start>
        <Finish>2027-03-10T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-03-10T08:00:00</Start>
        <Finish>2027-03-11T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-03-11T08:00:00</Start>
        <Finish>2027-03-12T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-03-12T08:00:00</Start>
        <Finish>2027-03-13T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-03-15T08:00:00</Start>
        <Finish>2027-03-16T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT24H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-03-16T08:00:00</Start>
        <Finish>2027-03-17T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT24H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-03-17T08:00:00</Start>
        <Finish>2027-03-18T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT24H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-03-18T08:00:00</Start>
        <Finish>2027-03-19T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT24H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-03-19T08:00:00</Start>
        <Finish>2027-03-20T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-03-23T08:00:00</Start>
        <Finish>2027-03-24T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-03-24T08:00:00</Start>
        <Finish>2027-03-25T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-03-25T08:00:00</Start>
        <Finish>2027-03-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>23</UID>
        <Start>2027-03-26T08:00:00</Start>
        <Finish>2027-03-26T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-01-19T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-01-19T08:00:00</Start>
        <Finish>2027-01-20T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-01-20T08:00:00</Start>
        <Finish>2027-01-21T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-01-21T08:00:00</Start>
        <Finish>2027-01-22T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-01-22T08:00:00</Start>
        <Finish>2027-01-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-01-25T08:00:00</Start>
        <Finish>2027-01-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-01-26T08:00:00</Start>
        <Finish>2027-01-27T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-01-27T08:00:00</Start>
        <Finish>2027-01-28T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-01-28T08:00:00</Start>
        <Finish>2027-01-29T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-01-29T08:00:00</Start>
        <Finish>2027-01-30T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-02-02T08:00:00</Start>
        <Finish>2027-02-03T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-02-03T08:00:00</Start>
        <Finish>2027-02-04T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-02-04T08:00:00</Start>
        <Finish>2027-02-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-02-05T08:00:00</Start>
        <Finish>2027-02-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-02-08T08:00:00</Start>
        <Finish>2027-02-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-02-09T08:00:00</Start>
        <Finish>2027-02-10T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-03-03T08:00:00</Start>
        <Finish>2027-03-04T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>230000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-03-04T08:00:00</Start>
        <Finish>2027-03-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>230000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-03-05T08:00:00</Start>
        <Finish>2027-03-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>230000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-03-08T08:00:00</Start>
        <Finish>2027-03-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>230000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-03-09T08:00:00</Start>
        <Finish>2027-03-10T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>344000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-03-10T08:00:00</Start>
        <Finish>2027-03-11T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>344000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-03-11T08:00:00</Start>
        <Finish>2027-03-12T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>344000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-03-12T08:00:00</Start>
        <Finish>2027-03-13T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>344000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-03-15T08:00:00</Start>
        <Finish>2027-03-16T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>224000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-03-16T08:00:00</Start>
        <Finish>2027-03-17T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>224000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-03-17T08:00:00</Start>
        <Finish>2027-03-18T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>224000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-03-18T08:00:00</Start>
        <Finish>2027-03-19T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>224000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-03-19T08:00:00</Start>
        <Finish>2027-03-20T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>80000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>132000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-03-23T08:00:00</Start>
        <Finish>2027-03-24T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>132000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-03-24T08:00:00</Start>
        <Finish>2027-03-25T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>132000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-03-25T08:00:00</Start>
        <Finish>2027-03-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>132000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>23</UID>
        <Start>2027-03-26T08:00:00</Start>
        <Finish>2027-03-26T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>132000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>24</UID>
      <ID>24</ID>
      <Name>Testing</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>3.1</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-01-18T08:00:00</Start>
      <Finish>2027-03-12T17:00:00</Finish>
      <Duration>PT320H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>1</Summary>
      <Critical>1</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>50</PercentComplete>
      <Cost>2420000</Cost>
      <ActualCost>1020000</ActualCost>
      <ConstraintType>0</ConstraintType>
      <Baseline>
        <Number>0</Number>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-03-12T17:00:00</Finish>
        <Duration>PT320H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT312H0M0S</Work>
        <Cost>2420000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-01-19T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-01-19T08:00:00</Start>
        <Finish>2027-01-20T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-01-20T08:00:00</Start>
        <Finish>2027-01-21T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-01-21T08:00:00</Start>
        <Finish>2027-01-22T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-01-22T08:00:00</Start>
        <Finish>2027-01-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-01-25T08:00:00</Start>
        <Finish>2027-01-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-01-26T08:00:00</Start>
        <Finish>2027-01-27T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-01-27T08:00:00</Start>
        <Finish>2027-01-28T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-01-28T08:00:00</Start>
        <Finish>2027-01-29T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-01-29T08:00:00</Start>
        <Finish>2027-01-30T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-02-02T08:00:00</Start>
        <Finish>2027-02-03T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-02-03T08:00:00</Start>
        <Finish>2027-02-04T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-02-04T08:00:00</Start>
        <Finish>2027-02-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-02-05T08:00:00</Start>
        <Finish>2027-02-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-02-08T08:00:00</Start>
        <Finish>2027-02-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-02-09T08:00:00</Start>
        <Finish>2027-02-10T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-03-03T08:00:00</Start>
        <Finish>2027-03-04T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT28H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-03-04T08:00:00</Start>
        <Finish>2027-03-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT28H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-03-05T08:00:00</Start>
        <Finish>2027-03-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT28H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-03-08T08:00:00</Start>
        <Finish>2027-03-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT28H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-03-09T08:00:00</Start>
        <Finish>2027-03-10T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-03-10T08:00:00</Start>
        <Finish>2027-03-11T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-03-11T08:00:00</Start>
        <Finish>2027-03-12T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>24</UID>
        <Start>2027-03-12T08:00:00</Start>
        <Finish>2027-03-12T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-01-19T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-01-19T08:00:00</Start>
        <Finish>2027-01-20T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-01-20T08:00:00</Start>
        <Finish>2027-01-21T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-01-21T08:00:00</Start>
        <Finish>2027-01-22T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-01-22T08:00:00</Start>
        <Finish>2027-01-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-01-25T08:00:00</Start>
        <Finish>2027-01-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-01-26T08:00:00</Start>
        <Finish>2027-01-27T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-01-27T08:00:00</Start>
        <Finish>2027-01-28T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-01-28T08:00:00</Start>
        <Finish>2027-01-29T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-01-29T08:00:00</Start>
        <Finish>2027-01-30T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-02-01T08:00:00</Start>
        <Finish>2027-02-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-02-02T08:00:00</Start>
        <Finish>2027-02-03T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-02-03T08:00:00</Start>
        <Finish>2027-02-04T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-02-04T08:00:00</Start>
        <Finish>2027-02-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-02-05T08:00:00</Start>
        <Finish>2027-02-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-02-08T08:00:00</Start>
        <Finish>2027-02-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-02-09T08:00:00</Start>
        <Finish>2027-02-10T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>60000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-03-03T08:00:00</Start>
        <Finish>2027-03-04T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>230000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-03-04T08:00:00</Start>
        <Finish>2027-03-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>230000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-03-05T08:00:00</Start>
        <Finish>2027-03-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>230000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-03-08T08:00:00</Start>
        <Finish>2027-03-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>230000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-03-09T08:00:00</Start>
        <Finish>2027-03-10T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>120000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-03-10T08:00:00</Start>
        <Finish>2027-03-11T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>120000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-03-11T08:00:00</Start>
        <Finish>2027-03-12T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>120000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>24</UID>
        <Start>2027-03-12T08:00:00</Start>
        <Finish>2027-03-12T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>120000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>25</UID>
      <ID>25</ID>
      <Name>Test plan and test cases</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>3.1.1</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-01-18T08:00:00</Start>
      <Finish>2027-01-22T17:00:00</Finish>
      <Duration>PT40H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT40H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>0</Critical>
      <TotalSlack>76800</TotalSlack>
      <PercentComplete>100</PercentComplete>
      <PercentWorkComplete>100</PercentWorkComplete>
      <Cost>300000</Cost>
      <ActualStart>2027-01-18T08:00:00</ActualStart>
      <ActualFinish>2027-01-22T17:00:00</ActualFinish>
      <ActualCost>300000</ActualCost>
      <ActualWork>PT40H0M0S</ActualWork>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>7</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-01-22T17:00:00</Finish>
        <Duration>PT40H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT40H0M0S</Work>
        <Cost>300000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>25</UID>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-01-22T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT40H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>25</UID>
        <Start>2027-01-18T08:00:00</Start>
        <Finish>2027-01-22T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>300000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>26</UID>
      <ID>26</ID>
      <Name>Automated regression suite</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>3.1.2</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-01-25T08:00:00</Start>
      <Finish>2027-02-09T17:00:00</Finish>
      <Duration>PT96H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT96H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>0</Critical>
      <TotalSlack>76800</TotalSlack>
      <PercentComplete>100</PercentComplete>
      <PercentWorkComplete>100</PercentWorkComplete>
      <Cost>720000</Cost>
      <ActualStart>2027-01-25T08:00:00</ActualStart>
      <ActualFinish>2027-02-09T17:00:00</ActualFinish>
      <ActualCost>720000</ActualCost>
      <ActualWork>PT96H0M0S</ActualWork>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>25</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-01-25T08:00:00</Start>
        <Finish>2027-02-09T17:00:00</Finish>
        <Duration>PT96H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT96H0M0S</Work>
        <Cost>720000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>26</UID>
        <Start>2027-01-25T08:00:00</Start>
        <Finish>2027-02-09T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT96H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>26</UID>
        <Start>2027-01-25T08:00:00</Start>
        <Finish>2027-02-09T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>720000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>27</UID>
      <ID>27</ID>
      <Name>System testing</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>3.1.3</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-03-03T08:00:00</Start>
      <Finish>2027-03-12T17:00:00</Finish>
      <Duration>PT64H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT128H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>0</Critical>
      <TotalSlack>4800</TotalSlack>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>960000</Cost>
      <ActualCost>0</ActualCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <RemainingWork>PT128H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>22</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <PredecessorLink>
        <PredecessorUID>26</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-03-03T08:00:00</Start>
        <Finish>2027-03-12T17:00:00</Finish>
        <Duration>PT64H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT128H0M0S</Work>
        <Cost>960000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>27</UID>
        <Start>2027-03-03T08:00:00</Start>
        <Finish>2027-03-12T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT128H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>27</UID>
        <Start>2027-03-03T08:00:00</Start>
        <Finish>2027-03-12T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>960000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>28</UID>
      <ID>28</ID>
      <Name>Performance and load testing</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>3.1.4</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-03-03T08:00:00</Start>
      <Finish>2027-03-08T17:00:00</Finish>
      <Duration>PT32H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT48H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>1</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>440000</Cost>
      <ActualCost>0</ActualCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <RemainingWork>PT48H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>22</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <ExtendedAttribute>
        <FieldID>188743783</FieldID>
        <Value>PT24H0M0S</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743785</FieldID>
        <Value>PT52H0M0S</Value>
      </ExtendedAttribute>
      <Baseline>
        <Number>0</Number>
        <Start>2027-03-03T08:00:00</Start>
        <Finish>2027-03-08T17:00:00</Finish>
        <Duration>PT32H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT48H0M0S</Work>
        <Cost>440000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>28</UID>
        <Start>2027-03-03T08:00:00</Start>
        <Finish>2027-03-08T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT48H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>28</UID>
        <Start>2027-03-03T08:00:00</Start>
        <Finish>2027-03-08T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>440000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>29</UID>
      <ID>29</ID>
      <Name>Security penetration test</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>3.1.5</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-03-03T08:00:00</Start>
      <Finish>2027-03-09T17:00:00</Finish>
      <Duration>PT40H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>0</Critical>
      <TotalSlack>33600</TotalSlack>
      <PercentComplete>0</PercentComplete>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>22</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-03-03T08:00:00</Start>
        <Finish>2027-03-09T17:00:00</Finish>
        <Duration>PT40H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
      </Baseline>
    </Task>
    <Task>
      <UID>30</UID>
      <ID>30</ID>
      <Name>Fixing</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>3.2</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-03-09T08:00:00</Start>
      <Finish>2027-03-26T17:00:00</Finish>
      <Duration>PT112H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>1</Summary>
      <Critical>1</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>0</PercentComplete>
      <Cost>2532000</Cost>
      <ActualCost>0</ActualCost>
      <ConstraintType>0</ConstraintType>
      <Baseline>
        <Number>0</Number>
        <Start>2027-03-09T08:00:00</Start>
        <Finish>2027-03-26T17:00:00</Finish>
        <Duration>PT112H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT280H0M0S</Work>
        <Cost>2532000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>30</UID>
        <Start>2027-03-09T08:00:00</Start>
        <Finish>2027-03-10T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT24H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>30</UID>
        <Start>2027-03-10T08:00:00</Start>
        <Finish>2027-03-11T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT24H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>30</UID>
        <Start>2027-03-11T08:00:00</Start>
        <Finish>2027-03-12T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT24H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>30</UID>
        <Start>2027-03-12T08:00:00</Start>
        <Finish>2027-03-13T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT24H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>30</UID>
        <Start>2027-03-15T08:00:00</Start>
        <Finish>2027-03-16T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT24H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>30</UID>
        <Start>2027-03-16T08:00:00</Start>
        <Finish>2027-03-17T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT24H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>30</UID>
        <Start>2027-03-17T08:00:00</Start>
        <Finish>2027-03-18T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT24H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>30</UID>
        <Start>2027-03-18T08:00:00</Start>
        <Finish>2027-03-19T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT24H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>30</UID>
        <Start>2027-03-19T08:00:00</Start>
        <Finish>2027-03-20T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>30</UID>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>30</UID>
        <Start>2027-03-23T08:00:00</Start>
        <Finish>2027-03-24T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>30</UID>
        <Start>2027-03-24T08:00:00</Start>
        <Finish>2027-03-25T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>30</UID>
        <Start>2027-03-25T08:00:00</Start>
        <Finish>2027-03-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>30</UID>
        <Start>2027-03-26T08:00:00</Start>
        <Finish>2027-03-26T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>30</UID>
        <Start>2027-03-09T08:00:00</Start>
        <Finish>2027-03-10T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>224000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>30</UID>
        <Start>2027-03-10T08:00:00</Start>
        <Finish>2027-03-11T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>224000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>30</UID>
        <Start>2027-03-11T08:00:00</Start>
        <Finish>2027-03-12T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>224000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>30</UID>
        <Start>2027-03-12T08:00:00</Start>
        <Finish>2027-03-13T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>224000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>30</UID>
        <Start>2027-03-15T08:00:00</Start>
        <Finish>2027-03-16T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>224000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>30</UID>
        <Start>2027-03-16T08:00:00</Start>
        <Finish>2027-03-17T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>224000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>30</UID>
        <Start>2027-03-17T08:00:00</Start>
        <Finish>2027-03-18T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>224000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>30</UID>
        <Start>2027-03-18T08:00:00</Start>
        <Finish>2027-03-19T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>224000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>30</UID>
        <Start>2027-03-19T08:00:00</Start>
        <Finish>2027-03-20T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>80000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>30</UID>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>132000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>30</UID>
        <Start>2027-03-23T08:00:00</Start>
        <Finish>2027-03-24T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>132000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>30</UID>
        <Start>2027-03-24T08:00:00</Start>
        <Finish>2027-03-25T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>132000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>30</UID>
        <Start>2027-03-25T08:00:00</Start>
        <Finish>2027-03-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>132000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>30</UID>
        <Start>2027-03-26T08:00:00</Start>
        <Finish>2027-03-26T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>132000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>31</UID>
      <ID>31</ID>
      <Name>Bug fixing</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>3.2.1</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-03-09T08:00:00</Start>
      <Finish>2027-03-18T17:00:00</Finish>
      <Duration>PT64H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT192H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>1</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>1792000</Cost>
      <ActualCost>0</ActualCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <RemainingWork>PT192H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>27</PredecessorUID>
        <Type>3</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>14400</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <PredecessorLink>
        <PredecessorUID>28</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <ExtendedAttribute>
        <FieldID>188743783</FieldID>
        <Value>PT48H0M0S</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743785</FieldID>
        <Value>PT104H0M0S</Value>
      </ExtendedAttribute>
      <Baseline>
        <Number>0</Number>
        <Start>2027-03-09T08:00:00</Start>
        <Finish>2027-03-18T17:00:00</Finish>
        <Duration>PT64H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT192H0M0S</Work>
        <Cost>1792000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>31</UID>
        <Start>2027-03-09T08:00:00</Start>
        <Finish>2027-03-18T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT192H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>31</UID>
        <Start>2027-03-09T08:00:00</Start>
        <Finish>2027-03-18T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>1792000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>32</UID>
      <ID>32</ID>
      <Name>Release candidate build</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>3.2.2</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-03-19T08:00:00</Start>
      <Finish>2027-03-19T17:00:00</Finish>
      <Duration>PT8H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT8H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>1</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>80000</Cost>
      <ActualCost>0</ActualCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <RemainingWork>PT8H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>31</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <PredecessorLink>
        <PredecessorUID>29</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <ExtendedAttribute>
        <FieldID>188743783</FieldID>
        <Value>PT8H0M0S</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743785</FieldID>
        <Value>PT12H0M0S</Value>
      </ExtendedAttribute>
      <Baseline>
        <Number>0</Number>
        <Start>2027-03-19T08:00:00</Start>
        <Finish>2027-03-19T17:00:00</Finish>
        <Duration>PT8H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT8H0M0S</Work>
        <Cost>80000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>32</UID>
        <Start>2027-03-19T08:00:00</Start>
        <Finish>2027-03-19T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>32</UID>
        <Start>2027-03-19T08:00:00</Start>
        <Finish>2027-03-19T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>80000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>33</UID>
      <ID>33</ID>
      <Name>User acceptance testing</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>3.2.3</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-03-22T08:00:00</Start>
      <Finish>2027-03-26T17:00:00</Finish>
      <Duration>PT40H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT80H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>1</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>660000</Cost>
      <ActualCost>0</ActualCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <RemainingWork>PT80H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>32</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <ExtendedAttribute>
        <FieldID>188743783</FieldID>
        <Value>PT32H0M0S</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743785</FieldID>
        <Value>PT64H0M0S</Value>
      </ExtendedAttribute>
      <Baseline>
        <Number>0</Number>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-26T17:00:00</Finish>
        <Duration>PT40H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT80H0M0S</Work>
        <Cost>660000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>33</UID>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-26T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT80H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>33</UID>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-26T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>660000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>34</UID>
      <ID>34</ID>
      <Name>Launch</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>4</OutlineNumber>
      <OutlineLevel>1</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-03-03T08:00:00</Start>
      <Finish>2027-04-06T17:00:00</Finish>
      <Duration>PT200H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>1</Summary>
      <Critical>1</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>0</PercentComplete>
      <Cost>1954000</Cost>
      <ActualCost>0</ActualCost>
      <ConstraintType>0</ConstraintType>
      <Baseline>
        <Number>0</Number>
        <Start>2027-03-03T08:00:00</Start>
        <Finish>2027-04-06T17:00:00</Finish>
        <Duration>PT200H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT228H0M0S</Work>
        <Cost>1954000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>34</UID>
        <Start>2027-03-03T08:00:00</Start>
        <Finish>2027-03-04T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>34</UID>
        <Start>2027-03-04T08:00:00</Start>
        <Finish>2027-03-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>34</UID>
        <Start>2027-03-05T08:00:00</Start>
        <Finish>2027-03-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>34</UID>
        <Start>2027-03-08T08:00:00</Start>
        <Finish>2027-03-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>34</UID>
        <Start>2027-03-09T08:00:00</Start>
        <Finish>2027-03-10T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>34</UID>
        <Start>2027-03-10T08:00:00</Start>
        <Finish>2027-03-11T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>34</UID>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT28H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>34</UID>
        <Start>2027-03-23T08:00:00</Start>
        <Finish>2027-03-24T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT28H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>34</UID>
        <Start>2027-03-24T08:00:00</Start>
        <Finish>2027-03-25T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>34</UID>
        <Start>2027-03-25T08:00:00</Start>
        <Finish>2027-03-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>34</UID>
        <Start>2027-03-26T08:00:00</Start>
        <Finish>2027-03-27T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>34</UID>
        <Start>2027-03-29T08:00:00</Start>
        <Finish>2027-03-30T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT20H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>34</UID>
        <Start>2027-03-30T08:00:00</Start>
        <Finish>2027-03-31T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT12H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>34</UID>
        <Start>2027-03-31T08:00:00</Start>
        <Finish>2027-04-01T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT12H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>34</UID>
        <Start>2027-04-01T08:00:00</Start>
        <Finish>2027-04-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT12H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>34</UID>
        <Start>2027-04-02T08:00:00</Start>
        <Finish>2027-04-03T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT12H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>34</UID>
        <Start>2027-04-05T08:00:00</Start>
        <Finish>2027-04-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT12H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>34</UID>
        <Start>2027-04-06T08:00:00</Start>
        <Finish>2027-04-06T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT12H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>34</UID>
        <Start>2027-03-03T08:00:00</Start>
        <Finish>2027-03-04T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>52000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>34</UID>
        <Start>2027-03-04T08:00:00</Start>
        <Finish>2027-03-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>52000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>34</UID>
        <Start>2027-03-05T08:00:00</Start>
        <Finish>2027-03-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>52000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>34</UID>
        <Start>2027-03-08T08:00:00</Start>
        <Finish>2027-03-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>52000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>34</UID>
        <Start>2027-03-09T08:00:00</Start>
        <Finish>2027-03-10T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>52000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>34</UID>
        <Start>2027-03-10T08:00:00</Start>
        <Finish>2027-03-11T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>52000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>34</UID>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>240000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>34</UID>
        <Start>2027-03-23T08:00:00</Start>
        <Finish>2027-03-24T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>240000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>34</UID>
        <Start>2027-03-24T08:00:00</Start>
        <Finish>2027-03-25T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>116000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>34</UID>
        <Start>2027-03-25T08:00:00</Start>
        <Finish>2027-03-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>72000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>34</UID>
        <Start>2027-03-26T08:00:00</Start>
        <Finish>2027-03-27T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>72000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>34</UID>
        <Start>2027-03-29T08:00:00</Start>
        <Finish>2027-03-30T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>196000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>34</UID>
        <Start>2027-03-30T08:00:00</Start>
        <Finish>2027-03-31T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>116000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>34</UID>
        <Start>2027-03-31T08:00:00</Start>
        <Finish>2027-04-01T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>118000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>34</UID>
        <Start>2027-04-01T08:00:00</Start>
        <Finish>2027-04-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>118000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>34</UID>
        <Start>2027-04-02T08:00:00</Start>
        <Finish>2027-04-03T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>118000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>34</UID>
        <Start>2027-04-05T08:00:00</Start>
        <Finish>2027-04-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>118000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>34</UID>
        <Start>2027-04-06T08:00:00</Start>
        <Finish>2027-04-06T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>118000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>35</UID>
      <ID>35</ID>
      <Name>Readiness</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>4.1</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-03-03T08:00:00</Start>
      <Finish>2027-03-30T17:00:00</Finish>
      <Duration>PT160H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>1</Summary>
      <Critical>1</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>0</PercentComplete>
      <Cost>876000</Cost>
      <ActualCost>0</ActualCost>
      <ConstraintType>0</ConstraintType>
      <Baseline>
        <Number>0</Number>
        <Start>2027-03-03T08:00:00</Start>
        <Finish>2027-03-30T17:00:00</Finish>
        <Duration>PT160H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT120H0M0S</Work>
        <Cost>876000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>35</UID>
        <Start>2027-03-03T08:00:00</Start>
        <Finish>2027-03-04T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>35</UID>
        <Start>2027-03-04T08:00:00</Start>
        <Finish>2027-03-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>35</UID>
        <Start>2027-03-05T08:00:00</Start>
        <Finish>2027-03-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>35</UID>
        <Start>2027-03-08T08:00:00</Start>
        <Finish>2027-03-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>35</UID>
        <Start>2027-03-09T08:00:00</Start>
        <Finish>2027-03-10T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>35</UID>
        <Start>2027-03-10T08:00:00</Start>
        <Finish>2027-03-11T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>35</UID>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>35</UID>
        <Start>2027-03-23T08:00:00</Start>
        <Finish>2027-03-24T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>35</UID>
        <Start>2027-03-24T08:00:00</Start>
        <Finish>2027-03-25T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>35</UID>
        <Start>2027-03-25T08:00:00</Start>
        <Finish>2027-03-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>35</UID>
        <Start>2027-03-26T08:00:00</Start>
        <Finish>2027-03-27T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>35</UID>
        <Start>2027-03-29T08:00:00</Start>
        <Finish>2027-03-30T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT4H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>35</UID>
        <Start>2027-03-30T08:00:00</Start>
        <Finish>2027-03-30T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT4H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>35</UID>
        <Start>2027-03-03T08:00:00</Start>
        <Finish>2027-03-04T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>52000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>35</UID>
        <Start>2027-03-04T08:00:00</Start>
        <Finish>2027-03-05T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>52000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>35</UID>
        <Start>2027-03-05T08:00:00</Start>
        <Finish>2027-03-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>52000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>35</UID>
        <Start>2027-03-08T08:00:00</Start>
        <Finish>2027-03-09T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>52000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>35</UID>
        <Start>2027-03-09T08:00:00</Start>
        <Finish>2027-03-10T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>52000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>35</UID>
        <Start>2027-03-10T08:00:00</Start>
        <Finish>2027-03-11T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>52000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>35</UID>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>116000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>35</UID>
        <Start>2027-03-23T08:00:00</Start>
        <Finish>2027-03-24T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>116000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>35</UID>
        <Start>2027-03-24T08:00:00</Start>
        <Finish>2027-03-25T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>116000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>35</UID>
        <Start>2027-03-25T08:00:00</Start>
        <Finish>2027-03-26T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>72000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>35</UID>
        <Start>2027-03-26T08:00:00</Start>
        <Finish>2027-03-27T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>72000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>35</UID>
        <Start>2027-03-29T08:00:00</Start>
        <Finish>2027-03-30T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>36000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>35</UID>
        <Start>2027-03-30T08:00:00</Start>
        <Finish>2027-03-30T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>36000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>36</UID>
      <ID>36</ID>
      <Name>User guide and release notes</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>4.1.1</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-03-03T08:00:00</Start>
      <Finish>2027-03-10T17:00:00</Finish>
      <Duration>PT48H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT48H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>0</Critical>
      <TotalSlack>48000</TotalSlack>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>312000</Cost>
      <ActualCost>0</ActualCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <RemainingWork>PT48H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>22</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-03-03T08:00:00</Start>
        <Finish>2027-03-10T17:00:00</Finish>
        <Duration>PT48H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT48H0M0S</Work>
        <Cost>312000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>36</UID>
        <Start>2027-03-03T08:00:00</Start>
        <Finish>2027-03-10T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT48H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>36</UID>
        <Start>2027-03-03T08:00:00</Start>
        <Finish>2027-03-10T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>312000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>37</UID>
      <ID>37</ID>
      <Name>Update the API reference</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>4.1.2</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-03-22T08:00:00</Start>
      <Finish>2027-03-24T17:00:00</Finish>
      <Duration>PT24H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT24H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>0</Critical>
      <TotalSlack>43200</TotalSlack>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>156000</Cost>
      <ActualCost>0</ActualCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <RemainingWork>PT24H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>32</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-24T17:00:00</Finish>
        <Duration>PT24H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT24H0M0S</Work>
        <Cost>156000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>37</UID>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-24T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT24H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>37</UID>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-24T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>156000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>38</UID>
      <ID>38</ID>
      <Name>Write the release blog post</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>4.1.3</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-03-29T08:00:00</Start>
      <Finish>2027-03-30T17:00:00</Finish>
      <Duration>PT16H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT8H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>0</Critical>
      <TotalSlack>24000</TotalSlack>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>72000</Cost>
      <ActualCost>0</ActualCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <RemainingWork>PT8H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>33</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-03-29T08:00:00</Start>
        <Finish>2027-03-30T17:00:00</Finish>
        <Duration>PT16H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT8H0M0S</Work>
        <Cost>72000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>38</UID>
        <Start>2027-03-29T08:00:00</Start>
        <Finish>2027-03-30T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>38</UID>
        <Start>2027-03-29T08:00:00</Start>
        <Finish>2027-03-30T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>72000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>39</UID>
      <ID>39</ID>
      <Name>Record the product demo video</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>4.1.4</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-03-22T08:00:00</Start>
      <Finish>2027-03-24T17:00:00</Finish>
      <Duration>PT24H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT24H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>0</Critical>
      <TotalSlack>43200</TotalSlack>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>192000</Cost>
      <ActualCost>0</ActualCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <RemainingWork>PT24H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>32</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-24T17:00:00</Finish>
        <Duration>PT24H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT24H0M0S</Work>
        <Cost>192000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>39</UID>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-24T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT24H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>39</UID>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-24T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>192000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>40</UID>
      <ID>40</ID>
      <Name>Support team training</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>4.1.5</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-03-25T08:00:00</Start>
      <Finish>2027-03-26T17:00:00</Finish>
      <Duration>PT16H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT16H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>1</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>144000</Cost>
      <ActualCost>0</ActualCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <RemainingWork>PT16H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>36</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <PredecessorLink>
        <PredecessorUID>33</PredecessorUID>
        <Type>0</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <ExtendedAttribute>
        <FieldID>188743783</FieldID>
        <Value>PT12H0M0S</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743785</FieldID>
        <Value>PT24H0M0S</Value>
      </ExtendedAttribute>
      <Baseline>
        <Number>0</Number>
        <Start>2027-03-25T08:00:00</Start>
        <Finish>2027-03-26T17:00:00</Finish>
        <Duration>PT16H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT16H0M0S</Work>
        <Cost>144000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>40</UID>
        <Start>2027-03-25T08:00:00</Start>
        <Finish>2027-03-26T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>40</UID>
        <Start>2027-03-25T08:00:00</Start>
        <Finish>2027-03-26T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>144000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>41</UID>
      <ID>41</ID>
      <Name>Go-live</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>4.2</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-03-22T08:00:00</Start>
      <Finish>2027-04-06T17:00:00</Finish>
      <Duration>PT96H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>1</Summary>
      <Critical>1</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>0</PercentComplete>
      <Cost>1078000</Cost>
      <ActualCost>0</ActualCost>
      <ConstraintType>0</ConstraintType>
      <Baseline>
        <Number>0</Number>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-04-06T17:00:00</Finish>
        <Duration>PT96H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT108H0M0S</Work>
        <Cost>1078000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>41</UID>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT12H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>41</UID>
        <Start>2027-03-23T08:00:00</Start>
        <Finish>2027-03-24T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT12H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>41</UID>
        <Start>2027-03-29T08:00:00</Start>
        <Finish>2027-03-30T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>41</UID>
        <Start>2027-03-30T08:00:00</Start>
        <Finish>2027-03-31T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>41</UID>
        <Start>2027-03-31T08:00:00</Start>
        <Finish>2027-04-01T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT12H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>41</UID>
        <Start>2027-04-01T08:00:00</Start>
        <Finish>2027-04-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT12H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>41</UID>
        <Start>2027-04-02T08:00:00</Start>
        <Finish>2027-04-03T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT12H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>41</UID>
        <Start>2027-04-05T08:00:00</Start>
        <Finish>2027-04-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT12H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>9</Type>
        <UID>41</UID>
        <Start>2027-04-06T08:00:00</Start>
        <Finish>2027-04-06T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT12H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>41</UID>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-23T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>124000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>41</UID>
        <Start>2027-03-23T08:00:00</Start>
        <Finish>2027-03-24T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>124000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>41</UID>
        <Start>2027-03-29T08:00:00</Start>
        <Finish>2027-03-30T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>160000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>41</UID>
        <Start>2027-03-30T08:00:00</Start>
        <Finish>2027-03-31T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>80000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>41</UID>
        <Start>2027-03-31T08:00:00</Start>
        <Finish>2027-04-01T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>118000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>41</UID>
        <Start>2027-04-01T08:00:00</Start>
        <Finish>2027-04-02T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>118000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>41</UID>
        <Start>2027-04-02T08:00:00</Start>
        <Finish>2027-04-03T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>118000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>41</UID>
        <Start>2027-04-05T08:00:00</Start>
        <Finish>2027-04-06T08:00:00</Finish>
        <Unit>1</Unit>
        <Value>118000</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>41</UID>
        <Start>2027-04-06T08:00:00</Start>
        <Finish>2027-04-06T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>118000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>42</UID>
      <ID>42</ID>
      <Name>Release runbook and rollback plan</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>4.2.1</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-03-22T08:00:00</Start>
      <Finish>2027-03-23T17:00:00</Finish>
      <Duration>PT16H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT24H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>0</Critical>
      <TotalSlack>14400</TotalSlack>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>248000</Cost>
      <ActualCost>0</ActualCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <RemainingWork>PT24H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>32</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-23T17:00:00</Finish>
        <Duration>PT16H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT24H0M0S</Work>
        <Cost>248000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>42</UID>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-23T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT24H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>42</UID>
        <Start>2027-03-22T08:00:00</Start>
        <Finish>2027-03-23T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>248000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>43</UID>
      <ID>43</ID>
      <Name>Change freeze and go/no-go</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>4.2.2</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-03-29T08:00:00</Start>
      <Finish>2027-03-29T17:00:00</Finish>
      <Duration>PT8H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT16H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>1</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>160000</Cost>
      <ActualCost>0</ActualCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <RemainingWork>PT16H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>33</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <PredecessorLink>
        <PredecessorUID>40</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <PredecessorLink>
        <PredecessorUID>42</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <ExtendedAttribute>
        <FieldID>188743783</FieldID>
        <Value>PT8H0M0S</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743785</FieldID>
        <Value>PT12H0M0S</Value>
      </ExtendedAttribute>
      <Baseline>
        <Number>0</Number>
        <Start>2027-03-29T08:00:00</Start>
        <Finish>2027-03-29T17:00:00</Finish>
        <Duration>PT8H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT16H0M0S</Work>
        <Cost>160000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>43</UID>
        <Start>2027-03-29T08:00:00</Start>
        <Finish>2027-03-29T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT16H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>43</UID>
        <Start>2027-03-29T08:00:00</Start>
        <Finish>2027-03-29T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>160000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>44</UID>
      <ID>44</ID>
      <Name>Production deployment</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>4.2.3</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-03-30T08:00:00</Start>
      <Finish>2027-03-30T17:00:00</Finish>
      <Duration>PT8H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT8H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>1</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>80000</Cost>
      <ActualCost>0</ActualCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <RemainingWork>PT8H0M0S</RemainingWork>
      <ConstraintType>4</ConstraintType>
      <ConstraintDate>2027-03-30T08:00:00</ConstraintDate>
      <PredecessorLink>
        <PredecessorUID>43</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <ExtendedAttribute>
        <FieldID>188743783</FieldID>
        <Value>PT8H0M0S</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743785</FieldID>
        <Value>PT12H0M0S</Value>
      </ExtendedAttribute>
      <Baseline>
        <Number>0</Number>
        <Start>2027-03-30T08:00:00</Start>
        <Finish>2027-03-30T17:00:00</Finish>
        <Duration>PT8H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT8H0M0S</Work>
        <Cost>80000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>44</UID>
        <Start>2027-03-30T08:00:00</Start>
        <Finish>2027-03-30T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT8H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>44</UID>
        <Start>2027-03-30T08:00:00</Start>
        <Finish>2027-03-30T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>80000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>45</UID>
      <ID>45</ID>
      <Name>Release 4.0 generally available</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>4.2.4</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-03-30T17:00:00</Start>
      <Finish>2027-03-30T17:00:00</Finish>
      <Duration>PT0H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Estimated>0</Estimated>
      <Milestone>1</Milestone>
      <Summary>0</Summary>
      <Critical>1</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>0</PercentComplete>
      <ConstraintType>0</ConstraintType>
      <Deadline>2027-04-06T17:00:00</Deadline>
      <PredecessorLink>
        <PredecessorUID>44</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-03-30T17:00:00</Start>
        <Finish>2027-03-30T17:00:00</Finish>
        <Duration>PT0H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
      </Baseline>
    </Task>
    <Task>
      <UID>46</UID>
      <ID>46</ID>
      <Name>Post-release monitoring</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>4.2.5</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-03-31T08:00:00</Start>
      <Finish>2027-04-06T17:00:00</Finish>
      <Duration>PT40H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Work>PT60H0M0S</Work>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <Critical>1</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>590000</Cost>
      <ActualCost>0</ActualCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <RemainingWork>PT60H0M0S</RemainingWork>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>45</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <ExtendedAttribute>
        <FieldID>188743783</FieldID>
        <Value>PT32H0M0S</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743785</FieldID>
        <Value>PT64H0M0S</Value>
      </ExtendedAttribute>
      <Baseline>
        <Number>0</Number>
        <Start>2027-03-31T08:00:00</Start>
        <Finish>2027-04-06T17:00:00</Finish>
        <Duration>PT40H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
        <Work>PT60H0M0S</Work>
        <Cost>590000</Cost>
      </Baseline>
      <TimephasedData>
        <Type>9</Type>
        <UID>46</UID>
        <Start>2027-03-31T08:00:00</Start>
        <Finish>2027-04-06T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>PT60H0M0S</Value>
      </TimephasedData>
      <TimephasedData>
        <Type>10</Type>
        <UID>46</UID>
        <Start>2027-03-31T08:00:00</Start>
        <Finish>2027-04-06T17:00:00</Finish>
        <Unit>1</Unit>
        <Value>590000</Value>
      </TimephasedData>
    </Task>
    <Task>
      <UID>47</UID>
      <ID>47</ID>
      <Name>Release closed</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <OutlineNumber>4.3</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2027-04-06T17:00:00</Start>
      <Finish>2027-04-06T17:00:00</Finish>
      <Duration>PT0H0M0S</Duration>
      <DurationFormat>7</DurationFormat>
      <Estimated>0</Estimated>
      <Milestone>1</Milestone>
      <Summary>0</Summary>
      <Critical>1</Critical>
      <TotalSlack>0</TotalSlack>
      <PercentComplete>0</PercentComplete>
      <ConstraintType>0</ConstraintType>
      <PredecessorLink>
        <PredecessorUID>46</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <Baseline>
        <Number>0</Number>
        <Start>2027-04-06T17:00:00</Start>
        <Finish>2027-04-06T17:00:00</Finish>
        <Duration>PT0H0M0S</Duration>
        <DurationFormat>7</DurationFormat>
      </Baseline>
    </Task>
  </Tasks>
  <Resources>
    <Resource>
      <UID>1</UID>
      <ID>1</ID>
      <Name>Product manager</Name>
      <Type>1</Type>
      <IsNull>0</IsNull>
      <Initials>PM</Initials>
      <Group>Product</Group>
      <MaxUnits>1</MaxUnits>
      <StandardRate>90</StandardRate>
    </Resource>
    <Resource>
      <UID>2</UID>
      <ID>2</ID>
      <Name>Product designer</Name>
      <Type>1</Type>
      <IsNull>0</IsNull>
      <Initials>PD</Initials>
      <Group>Product</Group>
      <MaxUnits>1</MaxUnits>
      <StandardRate>80</StandardRate>
    </Resource>
    <Resource>
      <UID>3</UID>
      <ID>3</ID>
      <Name>Tech lead</Name>
      <Type>1</Type>
      <IsNull>0</IsNull>
      <Initials>TL</Initials>
      <Group>Engineering</Group>
      <MaxUnits>1</MaxUnits>
      <StandardRate>110</StandardRate>
    </Resource>
    <Resource>
      <UID>4</UID>
      <ID>4</ID>
      <Name>Backend developers</Name>
      <Type>1</Type>
      <IsNull>0</IsNull>
      <Initials>BE</Initials>
      <Group>Engineering</Group>
      <MaxUnits>3</MaxUnits>
      <StandardRate>95</StandardRate>
    </Resource>
    <Resource>
      <UID>5</UID>
      <ID>5</ID>
      <Name>Frontend developers</Name>
      <Type>1</Type>
      <IsNull>0</IsNull>
      <Initials>FE</Initials>
      <Group>Engineering</Group>
      <MaxUnits>2</MaxUnits>
      <StandardRate>90</StandardRate>
    </Resource>
    <Resource>
      <UID>6</UID>
      <ID>6</ID>
      <Name>QA engineers</Name>
      <Type>1</Type>
      <IsNull>0</IsNull>
      <Initials>QA</Initials>
      <Group>Quality</Group>
      <MaxUnits>2</MaxUnits>
      <StandardRate>75</StandardRate>
    </Resource>
    <Resource>
      <UID>7</UID>
      <ID>7</ID>
      <Name>DevOps engineer</Name>
      <Type>1</Type>
      <IsNull>0</IsNull>
      <Initials>DO</Initials>
      <Group>Engineering</Group>
      <MaxUnits>1</MaxUnits>
      <StandardRate>100</StandardRate>
    </Resource>
    <Resource>
      <UID>8</UID>
      <ID>8</ID>
      <Name>Technical writer</Name>
      <Type>1</Type>
      <IsNull>0</IsNull>
      <Initials>TW</Initials>
      <Group>Product</Group>
      <MaxUnits>1</MaxUnits>
      <StandardRate>65</StandardRate>
    </Resource>
  </Resources>
  <Assignments>
    <Assignment>
      <UID>1</UID>
      <TaskUID>4</TaskUID>
      <ResourceUID>1</ResourceUID>
      <PercentWorkComplete>100</PercentWorkComplete>
      <ActualFinish>2027-01-08T17:00:00</ActualFinish>
      <ActualStart>2027-01-04T08:00:00</ActualStart>
      <ActualWork>PT40H0M0S</ActualWork>
      <Finish>2027-01-08T17:00:00</Finish>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <Start>2027-01-04T08:00:00</Start>
      <Units>1</Units>
      <Work>PT40H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>2</UID>
      <TaskUID>5</TaskUID>
      <ResourceUID>2</ResourceUID>
      <PercentWorkComplete>100</PercentWorkComplete>
      <ActualFinish>2027-01-11T17:00:00</ActualFinish>
      <ActualStart>2027-01-04T08:00:00</ActualStart>
      <ActualWork>PT48H0M0S</ActualWork>
      <Finish>2027-01-11T17:00:00</Finish>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <Start>2027-01-04T08:00:00</Start>
      <Units>1</Units>
      <Work>PT48H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>3</UID>
      <TaskUID>6</TaskUID>
      <ResourceUID>3</ResourceUID>
      <PercentWorkComplete>100</PercentWorkComplete>
      <ActualFinish>2027-01-15T17:00:00</ActualFinish>
      <ActualStart>2027-01-11T08:00:00</ActualStart>
      <ActualWork>PT40H0M0S</ActualWork>
      <Finish>2027-01-15T17:00:00</Finish>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <Start>2027-01-11T08:00:00</Start>
      <Units>1</Units>
      <Work>PT40H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>4</UID>
      <TaskUID>10</TaskUID>
      <ResourceUID>4</ResourceUID>
      <PercentWorkComplete>100</PercentWorkComplete>
      <ActualFinish>2027-01-29T17:00:00</ActualFinish>
      <ActualStart>2027-01-18T08:00:00</ActualStart>
      <ActualWork>PT160H0M0S</ActualWork>
      <Finish>2027-01-29T17:00:00</Finish>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <Start>2027-01-18T08:00:00</Start>
      <Units>2</Units>
      <Work>PT160H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>5</UID>
      <TaskUID>11</TaskUID>
      <ResourceUID>5</ResourceUID>
      <PercentWorkComplete>100</PercentWorkComplete>
      <ActualFinish>2027-01-29T17:00:00</ActualFinish>
      <ActualStart>2027-01-18T08:00:00</ActualStart>
      <ActualWork>PT160H0M0S</ActualWork>
      <Finish>2027-01-29T17:00:00</Finish>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <Start>2027-01-18T08:00:00</Start>
      <Units>2</Units>
      <Work>PT160H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>6</UID>
      <TaskUID>12</TaskUID>
      <ResourceUID>7</ResourceUID>
      <PercentWorkComplete>100</PercentWorkComplete>
      <ActualFinish>2027-01-25T17:00:00</ActualFinish>
      <ActualStart>2027-01-18T08:00:00</ActualStart>
      <ActualWork>PT48H0M0S</ActualWork>
      <Finish>2027-01-25T17:00:00</Finish>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <Start>2027-01-18T08:00:00</Start>
      <Units>1</Units>
      <Work>PT48H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>7</UID>
      <TaskUID>13</TaskUID>
      <ResourceUID>2</ResourceUID>
      <PercentWorkComplete>100</PercentWorkComplete>
      <ActualFinish>2027-02-03T17:00:00</ActualFinish>
      <ActualStart>2027-02-01T08:00:00</ActualStart>
      <ActualWork>PT24H0M0S</ActualWork>
      <Finish>2027-02-03T17:00:00</Finish>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <Start>2027-02-01T08:00:00</Start>
      <Units>1</Units>
      <Work>PT24H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>8</UID>
      <TaskUID>15</TaskUID>
      <ResourceUID>4</ResourceUID>
      <PercentWorkComplete>100</PercentWorkComplete>
      <ActualFinish>2027-02-12T17:00:00</ActualFinish>
      <ActualStart>2027-02-01T08:00:00</ActualStart>
      <ActualWork>PT160H0M0S</ActualWork>
      <Finish>2027-02-12T17:00:00</Finish>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <Start>2027-02-01T08:00:00</Start>
      <Units>2</Units>
      <Work>PT160H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>9</UID>
      <TaskUID>16</TaskUID>
      <ResourceUID>5</ResourceUID>
      <PercentWorkComplete>100</PercentWorkComplete>
      <ActualFinish>2027-02-12T17:00:00</ActualFinish>
      <ActualStart>2027-02-01T08:00:00</ActualStart>
      <ActualWork>PT160H0M0S</ActualWork>
      <Finish>2027-02-12T17:00:00</Finish>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <Start>2027-02-01T08:00:00</Start>
      <Units>2</Units>
      <Work>PT160H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>10</UID>
      <TaskUID>17</TaskUID>
      <ResourceUID>4</ResourceUID>
      <PercentWorkComplete>100</PercentWorkComplete>
      <ActualFinish>2027-02-05T17:00:00</ActualFinish>
      <ActualStart>2027-02-01T08:00:00</ActualStart>
      <ActualWork>PT40H0M0S</ActualWork>
      <Finish>2027-02-05T17:00:00</Finish>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <Start>2027-02-01T08:00:00</Start>
      <Units>1</Units>
      <Work>PT40H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>11</UID>
      <TaskUID>19</TaskUID>
      <ResourceUID>4</ResourceUID>
      <PercentWorkComplete>19</PercentWorkComplete>
      <ActualStart>2027-02-15T08:00:00</ActualStart>
      <ActualWork>PT33H26M0S</ActualWork>
      <Finish>2027-03-01T17:00:00</Finish>
      <RemainingWork>PT142H34M0S</RemainingWork>
      <Start>2027-02-15T08:00:00</Start>
      <Units>2</Units>
      <Work>PT176H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>12</UID>
      <TaskUID>20</TaskUID>
      <ResourceUID>5</ResourceUID>
      <PercentWorkComplete>25</PercentWorkComplete>
      <ActualStart>2027-02-15T08:00:00</ActualStart>
      <ActualWork>PT32H0M0S</ActualWork>
      <Finish>2027-02-24T17:00:00</Finish>
      <RemainingWork>PT96H0M0S</RemainingWork>
      <Start>2027-02-15T08:00:00</Start>
      <Units>2</Units>
      <Work>PT128H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>13</UID>
      <TaskUID>21</TaskUID>
      <ResourceUID>5</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualWork>PT0H0M0S</ActualWork>
      <Finish>2027-03-02T17:00:00</Finish>
      <RemainingWork>PT32H0M0S</RemainingWork>
      <Start>2027-02-25T08:00:00</Start>
      <Units>1</Units>
      <Work>PT32H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>14</UID>
      <TaskUID>25</TaskUID>
      <ResourceUID>6</ResourceUID>
      <PercentWorkComplete>100</PercentWorkComplete>
      <ActualFinish>2027-01-22T17:00:00</ActualFinish>
      <ActualStart>2027-01-18T08:00:00</ActualStart>
      <ActualWork>PT40H0M0S</ActualWork>
      <Finish>2027-01-22T17:00:00</Finish>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <Start>2027-01-18T08:00:00</Start>
      <Units>1</Units>
      <Work>PT40H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>15</UID>
      <TaskUID>26</TaskUID>
      <ResourceUID>6</ResourceUID>
      <PercentWorkComplete>100</PercentWorkComplete>
      <ActualFinish>2027-02-09T17:00:00</ActualFinish>
      <ActualStart>2027-01-25T08:00:00</ActualStart>
      <ActualWork>PT96H0M0S</ActualWork>
      <Finish>2027-02-09T17:00:00</Finish>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <Start>2027-01-25T08:00:00</Start>
      <Units>1</Units>
      <Work>PT96H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>16</UID>
      <TaskUID>27</TaskUID>
      <ResourceUID>6</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualWork>PT0H0M0S</ActualWork>
      <Finish>2027-03-12T17:00:00</Finish>
      <RemainingWork>PT128H0M0S</RemainingWork>
      <Start>2027-03-03T08:00:00</Start>
      <Units>2</Units>
      <Work>PT128H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>17</UID>
      <TaskUID>28</TaskUID>
      <ResourceUID>7</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualWork>PT0H0M0S</ActualWork>
      <Finish>2027-03-08T17:00:00</Finish>
      <RemainingWork>PT32H0M0S</RemainingWork>
      <Start>2027-03-03T08:00:00</Start>
      <Units>1</Units>
      <Work>PT32H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>18</UID>
      <TaskUID>28</TaskUID>
      <ResourceUID>6</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualWork>PT0H0M0S</ActualWork>
      <Finish>2027-03-08T17:00:00</Finish>
      <RemainingWork>PT16H0M0S</RemainingWork>
      <Start>2027-03-03T08:00:00</Start>
      <Units>0.5</Units>
      <Work>PT16H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>19</UID>
      <TaskUID>31</TaskUID>
      <ResourceUID>4</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualWork>PT0H0M0S</ActualWork>
      <Finish>2027-03-18T17:00:00</Finish>
      <RemainingWork>PT128H0M0S</RemainingWork>
      <Start>2027-03-09T08:00:00</Start>
      <Units>2</Units>
      <Work>PT128H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>20</UID>
      <TaskUID>31</TaskUID>
      <ResourceUID>5</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualWork>PT0H0M0S</ActualWork>
      <Finish>2027-03-18T17:00:00</Finish>
      <RemainingWork>PT64H0M0S</RemainingWork>
      <Start>2027-03-09T08:00:00</Start>
      <Units>1</Units>
      <Work>PT64H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>21</UID>
      <TaskUID>32</TaskUID>
      <ResourceUID>7</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualWork>PT0H0M0S</ActualWork>
      <Finish>2027-03-19T17:00:00</Finish>
      <RemainingWork>PT8H0M0S</RemainingWork>
      <Start>2027-03-19T08:00:00</Start>
      <Units>1</Units>
      <Work>PT8H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>22</UID>
      <TaskUID>33</TaskUID>
      <ResourceUID>1</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualWork>PT0H0M0S</ActualWork>
      <Finish>2027-03-26T17:00:00</Finish>
      <RemainingWork>PT40H0M0S</RemainingWork>
      <Start>2027-03-22T08:00:00</Start>
      <Units>1</Units>
      <Work>PT40H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>23</UID>
      <TaskUID>33</TaskUID>
      <ResourceUID>6</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualWork>PT0H0M0S</ActualWork>
      <Finish>2027-03-26T17:00:00</Finish>
      <RemainingWork>PT40H0M0S</RemainingWork>
      <Start>2027-03-22T08:00:00</Start>
      <Units>1</Units>
      <Work>PT40H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>24</UID>
      <TaskUID>36</TaskUID>
      <ResourceUID>8</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualWork>PT0H0M0S</ActualWork>
      <Finish>2027-03-10T17:00:00</Finish>
      <RemainingWork>PT48H0M0S</RemainingWork>
      <Start>2027-03-03T08:00:00</Start>
      <Units>1</Units>
      <Work>PT48H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>25</UID>
      <TaskUID>37</TaskUID>
      <ResourceUID>8</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualWork>PT0H0M0S</ActualWork>
      <Finish>2027-03-24T17:00:00</Finish>
      <RemainingWork>PT24H0M0S</RemainingWork>
      <Start>2027-03-22T08:00:00</Start>
      <Units>1</Units>
      <Work>PT24H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>26</UID>
      <TaskUID>38</TaskUID>
      <ResourceUID>1</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualWork>PT0H0M0S</ActualWork>
      <Finish>2027-03-30T17:00:00</Finish>
      <RemainingWork>PT8H0M0S</RemainingWork>
      <Start>2027-03-29T08:00:00</Start>
      <Units>0.5</Units>
      <Work>PT8H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>27</UID>
      <TaskUID>39</TaskUID>
      <ResourceUID>2</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualWork>PT0H0M0S</ActualWork>
      <Finish>2027-03-24T17:00:00</Finish>
      <RemainingWork>PT24H0M0S</RemainingWork>
      <Start>2027-03-22T08:00:00</Start>
      <Units>1</Units>
      <Work>PT24H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>28</UID>
      <TaskUID>40</TaskUID>
      <ResourceUID>1</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualWork>PT0H0M0S</ActualWork>
      <Finish>2027-03-26T17:00:00</Finish>
      <RemainingWork>PT16H0M0S</RemainingWork>
      <Start>2027-03-25T08:00:00</Start>
      <Units>1</Units>
      <Work>PT16H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>29</UID>
      <TaskUID>42</TaskUID>
      <ResourceUID>7</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualWork>PT0H0M0S</ActualWork>
      <Finish>2027-03-23T17:00:00</Finish>
      <RemainingWork>PT16H0M0S</RemainingWork>
      <Start>2027-03-22T08:00:00</Start>
      <Units>1</Units>
      <Work>PT16H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>30</UID>
      <TaskUID>42</TaskUID>
      <ResourceUID>3</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualWork>PT0H0M0S</ActualWork>
      <Finish>2027-03-23T17:00:00</Finish>
      <RemainingWork>PT8H0M0S</RemainingWork>
      <Start>2027-03-22T08:00:00</Start>
      <Units>0.5</Units>
      <Work>PT8H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>31</UID>
      <TaskUID>43</TaskUID>
      <ResourceUID>3</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualWork>PT0H0M0S</ActualWork>
      <Finish>2027-03-29T17:00:00</Finish>
      <RemainingWork>PT8H0M0S</RemainingWork>
      <Start>2027-03-29T08:00:00</Start>
      <Units>1</Units>
      <Work>PT8H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>32</UID>
      <TaskUID>43</TaskUID>
      <ResourceUID>1</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualWork>PT0H0M0S</ActualWork>
      <Finish>2027-03-29T17:00:00</Finish>
      <RemainingWork>PT8H0M0S</RemainingWork>
      <Start>2027-03-29T08:00:00</Start>
      <Units>1</Units>
      <Work>PT8H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>33</UID>
      <TaskUID>44</TaskUID>
      <ResourceUID>7</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualWork>PT0H0M0S</ActualWork>
      <Finish>2027-03-30T17:00:00</Finish>
      <RemainingWork>PT8H0M0S</RemainingWork>
      <Start>2027-03-30T08:00:00</Start>
      <Units>1</Units>
      <Work>PT8H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>34</UID>
      <TaskUID>46</TaskUID>
      <ResourceUID>7</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualWork>PT0H0M0S</ActualWork>
      <Finish>2027-04-06T17:00:00</Finish>
      <RemainingWork>PT40H0M0S</RemainingWork>
      <Start>2027-03-31T08:00:00</Start>
      <Units>1</Units>
      <Work>PT40H0M0S</Work>
    </Assignment>
    <Assignment>
      <UID>35</UID>
      <TaskUID>46</TaskUID>
      <ResourceUID>4</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualWork>PT0H0M0S</ActualWork>
      <Finish>2027-04-06T17:00:00</Finish>
      <RemainingWork>PT20H0M0S</RemainingWork>
      <Start>2027-03-31T08:00:00</Start>
      <Units>0.5</Units>
      <Work>PT20H0M0S</Work>
    </Assignment>
  </Assignments>
</Project>