Free template

Free Project Tracker Template

A plain project tracker: set up, plan, do, review and close, 15 tasks in all, and three columns on every row for the questions a tracker answers each week: what state is it in, who has it, and how far along is it. Every row starts at Not started, no owner and 0 percent, ready for your names.

No credit card. Import the spreadsheet as a new project on the Free plan.

The spreadsheet is a 15-task plan with phases, durations and milestones, plus Status, Owner and % complete columns on every row, ready for Excel or Google Sheets. It carries no dates, so set your own start, or paste it into the Gantt chart generator to have the schedule built for you. Want to compare the plans side by side first? Every one of them is on the project plan template page, with the rows shown before you download.

What’s inside

All 15 tasks are below, from naming the project owner to recording the lessons, each with its description, duration and priority. In the spreadsheet every one of them also carries Status, Owner and % complete.

15

Scheduled tasks

5

Phases

4

Milestones

~8

Weeks end to end

A plan says what, a tracker says where it stands

Most project plans stop at the task list. A tracker adds the three columns people actually read in a weekly meeting: Status, Owner and % complete. This template puts them on every row, after the phase, task, duration, priority and notes, so the same file is the plan on day one and the progress report every week after it.

The phases are deliberately plain, because a tracker is for the projects that do not need a methodology: set up, plan, do, review and close. Two of the tasks are the tracking itself. Giving every task an owner happens in planning, before any work starts, and updating status and % complete is a task that runs the whole length of the work, because a tracker nobody updates is a list of good intentions.

The file is a CSV, so it has no dropdowns, formulas or colours: Status is plain text and % complete a number. Excel opens it directly and Google Sheets imports it, and a filter on the Status column is all most weekly reviews need. It has no start or finish dates until you pick a start; paste it into the free Gantt chart generator and the chart is built from the durations, with the % complete column read as each bar's progress.

The plan, phase by phase

Set Up3 tasks

Name the project and its owner

One line on what the project delivers and the one person accountable for it.

1 dayHigh

Agree what done looks like

The few results that mean the project is finished, written down so the review can check them.

2 daysHigh

List who needs progress updates

The sponsor, the team and anyone affected, and how often each of them wants to hear.

1 dayMedium

Plan3 tasks

Break the work into tasks

Small enough that each one has a single owner and finishes inside two weeks.

3 daysHigh

Give every task an owner

One name in the Owner column of every row, agreed with that person before the work starts.

1 dayHigh

Agree the status values and update day

Not started, In progress, Blocked and Done, and the day each week every owner updates their rows.

1 dayMedium

Do4 tasks

Work the first group of tasks

Rename it for your first piece of work. Status moves to Done only when the result is accepted.

10 daysHigh

Work the second group of tasks

Rename it for your second piece of work, and add rows until the list matches your project.

10 daysHigh

Update status and % complete every week

Each owner updates their own rows on the agreed day, so the tracker is never more than a week old.

20 daysCritical

Log blockers as they appear

Set the row to Blocked, write what is in the way in its notes, and name who can clear it.

20 daysHigh

Review3 tasks

Review progress with the sponsor

Walk through the tracker row by row, starting with anything Blocked or behind.

1 dayMedium

Check the results against what done looks like

Each result agreed in set up, checked and marked met or not met.

2 daysHigh

Fix what the review found

One row per gap, each with an owner, until every result is met.

5 daysHigh

Close2 tasks

Hand over the results

To the people who will use or run them, with the notes they need to do it.

2 daysHigh

Record what to do differently

What slowed the project down and what helped, kept with the tracker for the next one.

1 dayMedium

Milestones

Four milestones: the plan agreed, the work complete, the review signed off and the project closed. In the spreadsheet they are rows like the tasks, with a status of their own.

Plan agreed

Day 13 of the plan

Work complete

Day 41 of the plan

Review signed off

Day 52 of the plan

Project closed

Day 56 of the plan

Frequently asked

What is in the download?

A CSV file with eight columns: Phase, Task, Duration (days), Priority, Notes, Status, Owner and % complete. It holds the 15 tasks and the four milestones as zero-day rows, each starting at Not started, no owner and 0. Excel opens it directly and Google Sheets imports it.

Why are there no start and finish dates?

Because a template has none until you choose a start, and dates baked into a download would be wrong the day after you saved it. Add your own, or paste the file into the Gantt chart generator, which builds the dates from the durations.

Does the Status column have a dropdown?

No. A CSV file carries values only, with no dropdowns, formulas or colours, so Status is plain text. The plan suggests four values, Not started, In progress, Blocked and Done; keep to them and a filter on the column shows what needs attention.

How do I keep it up to date?

Pick one day a week and have each owner update their own rows: the status, the percent complete and a note on anything blocked. When the team outgrows passing a file around, import it into a free Onplana project, where each owner updates their own tasks and the Gantt chart moves with them.

Start with the plan already built

Import the Project Tracker spreadsheet into a free Onplana project and your phases, tasks, and milestones are scheduled from the start date you pick. No credit card, no time limit.