All Onplana Tasks apps

Safari extension

Mac App Store

The same toolbar companion, built for Safari.

The same toolbar companion, in Safari. Ships as a small Mac app that adds the extension to your browser, so it is a separate install from Onplana Tasks for Mac, the menu-bar app.

macOS 13 Ventura or later. Free.

What it looks like

The real app, not a mock-up. These are the screenshots from the store listing.

  • Everything assigned to you, grouped by when it is due.
  • Capture the page you are reading, link and title included.
  • See what's due, grouped by day
  • Capture any page as a task or an issue
  • Check what your agents are stuck on

Why it is a separate install

Safari extensions ship inside a Mac app rather than from a browser gallery, so this one arrives through the Mac App Store and updates on Apple's review schedule. It is a different install from Onplana Tasks for Mac, the menu-bar app, and you can run both: the extension lives in Safari's toolbar, the menu-bar app lives beside your clock.

See and capture without changing tabs

Your assigned work is one click from the toolbar, grouped by day. Capture the page you are reading as a task and it keeps the link and title, or log an issue about it straight into the project Issue Log.

What Safari does differently

Safari does not implement the extension notification API, so there is no due-today reminder on this platform and capture confirmations flash on the toolbar icon instead. Everything else behaves as it does in Chrome. If you want the daily reminder on a Mac, Onplana Tasks for Mac has it.

Bring someone in without leaving the app

If you own or manage a project, invite people to it from the app and give them a task. Someone already in your workspace gets it at once; someone new joins as a guest, and the task moves to them when they accept.

Read the setup guide

Questions

Can I use it without an Onplana account?

Yes. Signed out, it is a task list kept in this browser, and it makes no network requests until you sign in. Sign in when you want your agents, projects and team, and it offers to move those tasks into Onplana.

Do I need Onplana Tasks for Mac as well?

No. They are independent. The Safari extension puts Onplana in your browser toolbar; Onplana Tasks for Mac puts it in your menu bar with a global quick-add shortcut. Install either, or both.

Does it cost anything?

No. Every Onplana Tasks companion is free and included with every plan, including the free plan. It is a companion to your Onplana account, and you can try it without one: your tasks stay on the device until you sign in.

Do I need it to use Onplana?

No. Everything it does, the web app does. The companions exist so the work you have been assigned is one click, one keystroke or one swipe away instead of a tab you have to go and find.

Will my work sync?

Yes. It is the same account and the same data, so a task you complete in a companion is complete everywhere, and a task assigned to you in the web app appears here.