Free on every plan

Free project templates

Start from a plan, not a blank board. Each template below becomes a real, fully editable project in Onplana (17 open straight from their page, the others import from their spreadsheet), phases, scheduled tasks with priorities and estimates, and milestones included, on the Free plan with no credit card. Every one of them also downloads as a spreadsheet for Excel or Google Sheets, with no sign-up.

No credit card. Templates are on the Free plan.

Start a new project in Onplana, pick any template on this page to see its phases and tasks, and use it to land a real, editable project.

Software Product Launch

Ship your next product on a plan that already exists. This launch template lays out the full arc, customer discovery, MVP build, closed beta, and GA day, as 12 scheduled tasks with priorities, effort estimates, and two launch milestones. Open it in Onplana and you start from a working plan instead of a blank board.

12 tasks 2 milestones ~9 weeks
3 phases
View template

Marketing Campaign

Plan, produce, launch, and measure an integrated campaign without reinventing the checklist. This campaign template covers the whole cycle, goals and channel mix, creative production, paid and owned launch, and the post-campaign retrospective, as 10 scheduled tasks across four phases with a go-live milestone at day 28.

10 tasks 1 milestone ~6 weeks
4 phases
View template

Event Planning

Run your event on a 90-day countdown instead of a sticky-note wall. This event planning template sequences everything from venue tours and speaker outreach to badge printing, volunteer briefings, and the day-of run sheet, 14 scheduled tasks across five phases, each timed backwards from event day.

14 tasks 1 milestone ~13 weeks
5 phases
View template

Migration from MS Project

Move your Microsoft Project schedules with a plan, not a prayer. This template sequences a 30-day move of your .mpp and Project XML files into Onplana: inventory and stakeholder sign-off, collecting and cleaning the files, staging import, reconciliation and pilot UAT, then the production import. It ships with a pre-logged risk about legacy custom-field mapping, so the most common surprise is already on your radar.

10 tasks 2 milestones ~4 weeks
5 phases
View template

Data Migration Cutover

A migration project plan for SharePoint, Microsoft 365, file server and Azure moves, as an Excel file or a live project. Migrations do not fail at the copy, they fail at the edges: permissions that did not come across, a wave sized from a lab measurement, and the delta nobody ran. This plan sequences a 60-day move as waves rather than a weekend, with a pilot signed off before wave one, a delta sync behind every wave, and two pre-logged risks that account for most of the overruns.

14 tasks 4 milestones ~9 weeks
5 phases
View template

OKR Quarterly Planning

Run a complete OKR cycle, not just a kickoff meeting. This quarterly OKR template schedules the whole 90 days: drafting company objectives, workshopping key results, cascading to teams, weekly check-ins, a mid-quarter review, and end-of-quarter scoring. Eight tasks across four phases keep the cadence honest from week 1 to week 13.

8 tasks 1 milestone ~13 weeks
4 phases
View template

Client Engagement

A consulting engagement that starts without agreed acceptance criteria ends in an argument about the final invoice. This template schedules the whole nine weeks: signed scope and rate card first, discovery that tests what the statement of work assumed, delivery with change requests priced as they arise, and a close that ends in written acceptance and a margin review.

13 tasks 3 milestones ~9 weeks
4 phases
View template

Phase-Gate Product Development

Phase-gate development works when the gates are real decisions and fails when they are status meetings. This template schedules six months from concept to market with four explicit gate reviews, each one a go, no-go, or recycle with the reviewers and conditions recorded, plus the design freeze that turns every later change into formal change control.

14 tasks 5 milestones ~26 weeks
5 phases
View template

RIBA Plan of Work (Architecture)

Architecture practices lose fees between stages, not inside them: the concept change reworked into Stage 3 without a variation, the construction-stage hours that outrun the Stage 5 share. This template lays the RIBA Plan of Work 2020 out as eight phases, with a client sign-off closing each of Stages 1 to 4, so the fee schedule, the programme and the hours are one record from Stage 0 to handover.

22 tasks 6 milestones ~60 weeks
8 phases
View template

AIA Design Phases (Architecture, US)

The AIA phases already come with a fee split most owners recognise: 15 percent schematic design, 20 design development, 40 construction documents, 5 bidding, 20 construction administration. What practices lose is the link between that split and the hours, when a design-development change is drawn into the construction documents without an additional-services request. This template lays the five phases out, with an owner approval closing each of the three design phases, so the approval, the fee share and the hours are one record.

17 tasks 6 milestones ~57 weeks
5 phases
View template

Construction Documents and Closeout

Closeout is where a building project drifts for months: the punch list that never quite closes, the manuals nobody delivered, the retainage released too early. This template plans it from the day the construction documents are issued, with a closeout list agreed at preconstruction, submittals and RFIs through construction administration, a punch list backed to zero, and every manual, warranty, record drawing and lien waiver in hand before final payment.

18 tasks 5 milestones ~38 weeks
6 phases
View template

Annual Portfolio Plan

Next year's portfolio as one plan you can argue about before it is funded. Eight sample initiatives, each with a case for it, the delivery and a check on whether it paid off, sit as phases on one timeline, with the plan approval and four portfolio reviews as milestones. Opened in Onplana, it also brings a capacity sheet by role and quarter and a one-page scoring guide, so the debate about what fits runs on numbers.

24 tasks 5 milestones ~57 weeks
8 phases
View template

Project Schedule

A general project schedule for a 12-week project, laid out the way a schedule is built: charter and kickoff, a work breakdown with a duration on every task, a baseline, three work packages, the weekly control loop running alongside them, and a proper close. Rename the work packages and it fits most projects that are not yet sure what shape they are.

19 tasks 4 milestones ~12 weeks
5 phases
View template

Project Timeline

A six-month project on one page: a month to discover, two to design and build, one to test, one to launch and one to measure what it achieved. Fewer, longer tasks than a working schedule, and a milestone at the end of each stretch, so it reads at a glance in a steering meeting.

14 tasks 5 milestones ~26 weeks
5 phases
View template

Construction Project

A building project from the general contractor's side, start to handover: estimate, permits and buyout in preconstruction, then site work and foundations, the frame, the envelope, MEP rough-in and interiors, and closeout to the certificate of occupancy. About 36 weeks for a small commercial building, with the inspections and the dry-in date where they really fall.

20 tasks 5 milestones ~36 weeks
6 phases
View template

Agile Project

A nine-week agile project: a short sprint 0 to write the vision, build the first backlog and agree the definition of done, three two-week sprints with planning, delivery and a review and retrospective, then a release sprint to harden, ship and refine the backlog for what comes next.

17 tasks 5 milestones ~9 weeks
5 phases
View template

Project Tracker

A plain project tracker: set up, plan, do, review and close, 15 tasks in all, and three columns on every row for the questions a tracker answers each week: what state is it in, who has it, and how far along is it. Every row starts at Not started, no owner and 0 percent, ready for your names.

15 tasks 4 milestones ~8 weeks
5 phases
View template

Project Milestones

A plan built around its milestones: seven of them, from the approved brief to the closed project, and before each one a sign-off task that says what proves it was met. Fill in the work between them and the milestones stay the dates everyone outside the team watches.

19 tasks 7 milestones ~10 weeks
6 phases
View template

Frequently asked

Are these project templates really free?

Yes. Every template on this page downloads as a spreadsheet with no signup, and opens on the free Onplana plan with no credit card and no time limit, either straight from its "Use this template" button or by importing the spreadsheet. You get the full plan, phases, tasks with priorities and durations, and milestones, as a real project you own and can edit.

What happens when I click "Use this template"?

You create a free Onplana account (or sign in), and the template opens as a working project: phases become color-coded groups, tasks are scheduled from today with realistic durations, and milestones land on the timeline. From there you rename, reassign, and reschedule like any other project.

Can I edit a template after I open it?

Completely. A template is just a head start: every task, phase, milestone, date, and priority is editable, and you can switch between list, board, Gantt, and calendar views. Nothing is locked.

Can I save my own templates?

Yes. Beyond this gallery, Onplana lets you save any project as a reusable template for your organization on paid plans, so the launch plan you refine this quarter becomes the starting point for the next one.

Open a template, skip the blank page

Pick a template, sign up free, and your plan is scheduled before the kickoff meeting. No credit card, no time limit.