Onplana Schedule for iPhone, iPad and Android

Open an .mpp on your iPhone or Android, free

Read a Microsoft Project plan on your phone as a list or a timeline, edit it, and share it as Project XML, CSV, PDF or picture. No Microsoft Project, and no account until you publish.

Now on the App Store for iPhone and iPad, and on Google Play for Android.

On Android, free on Google Play

Onplana Schedule for Android phones and tablets opens, edits and saves the plan, with nothing to buy in the app.

Get it on Google Play

On iPhone and iPad, free on the App Store

Onplana Schedule for iPhone and iPad opens, edits and saves the plan, with nothing to buy in the app. It needs iOS 17.4 or later.

Download on the App Store

On Windows or a Mac

Onplana Schedule for Windows and Mac opens, edits and saves the same files, free.

Windows 10 (1809) or later, 64-bit; macOS 13 or later; iPhone or iPad with iOS 17.4 or later; Android 7.0 or later. In English, Spanish, French, Portuguese, German, Italian, Japanese, Chinese and Arabic. Free.

What it does on your phone

Open the file

Open an .mpp, .mpt, .mpx, .xer or Project XML file from Files or your phone's storage, or share it to Onplana Schedule from Mail, Teams or any app that sends a file on.

Read the plan

A list of tasks or a timeline, with the links, the milestones and the critical path in red. Search the list, or narrow it to the critical tasks only.

Edit and save

Tap a task to change its name, start, finish, duration, percent complete and predecessors, or drag a bar on the timeline. Each change reschedules the linked tasks, and Undo takes it back. A file opened as .mpp saves as Project XML, so the original is never overwritten.

Update it on site

Show only this week or the next two weeks, and swipe a task to mark it done.

Share it

Send the plan as Project XML, the task table as CSV, or the chart as a PDF or picture, to Mail, Teams, Messages or Files.

Publish and invite

Publish a copy to a free Onplana workspace (2 projects, 5 members) and invite your team from the phone. They open it in a browser.

Check its quality

Run the DCMA 14-point checks on the phone and see the tasks behind each finding, or send a copy for the free health check report.

Light or dark

Settings > Appearance follows your phone, or keeps the app light or dark.

On iPhone, iPad and Android

Screens from the app itself, not mock-ups.

On iPhone, the plan as a list, phase by phase.
The iPhone timeline, with the links between tasks.
On an iPad, the full editor the desktop app has.
On Android, the plan as a list.
The Android timeline, with today's line and the float colours.
On an Android tablet, the same full editor.

Project XML opens on your phone. Every other file, an .mpp included, is converted on Onplana's servers, and the uploaded copy is deleted within 3 days, and removed from backups 7 days after that. The app asks before it converts or checks a file.

How to open an MPP file on a phone

  1. Open the file. Tap Open a file and choose it, or share an .mpp attachment from Mail, Teams or Files to Onplana Schedule.
  2. Allow the conversion. A Project XML file opens on the phone. For an .mpp the app names the file and asks before it sends a copy to be converted.
  3. Read and edit the plan. Switch between the list and the timeline, show the critical tasks only, and tap a task to edit it. Save, or share the plan as Project XML, CSV, PDF or picture.

On a computer now? Onplana Schedule for Windows and Mac edits and saves the plan, and the online MPP viewer opens it in a browser with nothing to install. New to the format? What is an MPP file explains it.

Updated .

Frequently asked questions

Can I open an .mpp file on an iPhone or an Android phone?

Yes, with Onplana Schedule, a free app for iPhone and iPad on the App Store and for Android phones and tablets on Google Play. It opens Microsoft Project .mpp files without Microsoft Project, and also Project XML and Primavera P6 .xer. It needs iOS 17.4 or later, or Android 7.0 or later, and the same app is a free download for Windows and Mac.

Is it free?

Yes. The app is free to download and free to use, editing and saving included, and there is nothing to buy in the app. Publishing a copy creates a free Onplana workspace (2 projects, 5 members). Signed in to a workspace on the Professional plan or above, the phone adds Set baseline and Move project.

Is my file uploaded?

A Microsoft Project XML file opens on your phone and is uploaded only if you run a health check on it or publish a copy. On a tablet, Save as Primavera .xer also sends the plan, which is converted on Onplana's servers and not kept there; on a phone the app has no Save as Primavera .xer. Every other file, an .mpp included, is converted on Onplana's servers, and the uploaded copy is deleted within 3 days, and removed from backups 7 days after that. The app asks before it converts or checks a file, each time until you tell it to stop.

Can I open an .mpp attachment from Mail or Teams?

Yes. Share the attachment to Onplana Schedule, or choose it in Open In. On an iPhone a file sent from another app opens as a copy, so Save asks where to keep your edited plan and the attachment is left as it was.

Can I edit the plan and send it back?

Yes. Edit tasks, dates, durations, percent complete and links on the phone, then save. A file opened as .mpp saves as Project XML, which Microsoft Project opens. Share sends the plan as Project XML, the task table as CSV, or the chart as a PDF or picture.

What about a tablet?

On an iPad or an Android tablet the app shows the grid beside the Gantt chart, the screen the desktop app has, with the Resource usage view.

Is there a dark mode?

Yes. Settings > Appearance offers Match the system, Light or Dark.