Free, no sign-up, no add-on

Jira Gantt chart from your CSV export

Yes, you can see your Jira issues as a Gantt chart without installing a Marketplace app. Export the issues as CSV, drop the file on the viewer below, and each issue with dates becomes a bar, grouped under its epic, with the blocks links drawn between the bars and the critical path worked out from them.

  • Start date and Due date become the bars
  • Epics become summary rows, with their issues under them
  • Blocks links become links between the bars, and the critical path follows them
  • Assignee and status come through with each issue

Export your Jira issues as CSV

  1. In Jira, go to your project and select List. Change the filter if you want only some of the work items.
  2. Select the More actions menu (three dots).
  3. Choose Export, then Export CSV - all fields.

These are the steps for Jira Cloud in Atlassian's support article on exporting issues to CSV (read November 2026). The bars come from each issue's Start date and Due date fields; an issue with only a Due date is a one-day bar ending on that date.

Drop the CSV here

Drop the file anywhere on this window, or choose Open a file. Leave the column names as Jira wrote them: the viewer recognises them.

A CSV is uploaded and converted on Onplana's servers to open it, and the viewer asks first. The uploaded copy is deleted within 3 days, and removed from backups 7 days after that.

Loading the viewer…

The viewer reads the plan and changes nothing in Jira. To move dates and save the plan, use Onplana Schedule, free for Windows and Mac

What the Gantt here shows

Each issue is a bar from its start date to its due date, under its epic, on one timeline you can read by day, week or month. Where one issue blocks another, a link joins the two bars, and the chain that sets the last date is in red, with the slack of every other issue beside its bar. The same plan opens as a task sheet and as a network diagram from the tabs above the chart, and you can download the chart as PNG or PDF.

Want a second opinion on the plan itself? The Schedule Health Check reviews it for missing links, open ends and dates that cannot hold. In the viewer it is Analyze > Check health, on the plan you just opened.

Updated .

Frequently asked questions

Do I need a Jira Marketplace app for this?

No. Export the issues as CSV from Jira and drop the file on the viewer on this page. Nothing connects to your Jira site, and nothing in Jira changes.

Which export should I choose?

Export CSV - all fields. It carries the Start date, Due date and Parent columns the chart is built from.

Why are some bars only one day long?

Those issues have a Due date and no Start date, so each is drawn as one day ending on its due date. Give the issue a Start date in Jira, then export again.

Are links between issues shown?

Yes, the blocks links. The CSV's Inward and Outward issue link (Blocks) columns become links between the bars, and the critical path is worked out from them and the dates. Other link types are not drawn.

Is my file uploaded when I drop it on the viewer?

Yes. A CSV is converted on Onplana's servers to open it, and the viewer asks first. The uploaded copy is deleted within 3 days, and removed from backups 7 days after that.

Keep the plan as a Gantt

The viewer forgets the file when you close the page. A free Onplana workspace keeps the plan online with your team: dependencies, the critical path, baselines and progress that rolls up. No credit card.