Microsoft Project versus PrimaveraThrough November 6, 2026

Microsoft Project files make up 86% of uploaded schedules, and Primavera files 8%

Of 522 free and anonymous schedules whose format was recorded. Neither group is published until it holds at least 20 schedules.

How many project schedules are Microsoft Project files, and how many Primavera P6?

86% of 522 uploaded schedules whose format was recorded are Microsoft Project files, and 8% are Primavera P6. The free tools read both, so an .mpp and an .xer can be checked side by side.

Which application wrote the fileEach bar is a share of the uploads whose application or file type was recorded, with its n.
  • Microsoft Project86%
    n = 522
  • Primavera P68%
    n = 522
  • Another application6%
    n = 522

What this means for your plan

Moving a plan between Microsoft Project and Primavera P6 keeps tasks and links, but calendars, constraints and lags do not always carry over as set. Check the schedule after the move, so a broken link or a pinned date shows before the next update.

Check your own schedule free
  • 86%

    Microsoft Project

    449 schedules

  • 8%

    Primavera

    41 schedules

File types uploaded to our free tools

Of 770 free and anonymous schedules uploaded to our free tools, by the file type the upload recorded. The upload records every file that is not XML as .mpp, so Primavera .xer uploads are counted under .mpp here, and Primavera XML under XML. This split cannot tell Microsoft Project from Primavera.

  • .mpp and other files not in XML, Primavera .xer included86%
  • XML files, Project XML and Primavera XML11%
  • Excel workbook2%
  • CSV0%
  • Pasted text0%
  • Other0%

Which application wrote the file

As the file itself records it, for 522 uploads whose application our converter could name.

  • Microsoft Project86%
  • Primavera P68%
  • Another application6%

File kinds uploaded

Of 522 uploads to the Schedule Health Check, the MPP viewer and Onplana Schedule whose format was recorded.

  • Microsoft Project .mpp77%
  • Microsoft Project template .mpt0%
  • Project XML (MSPDI)9%
  • MPX0%
  • Primavera .xer8%
  • Primavera XML0%
  • Excel workbook2%
  • CSV1%
  • Pasted text0%
  • Other4%

File kinds opened in Onplana Schedule

Of 307 files opened in the desktop app that name their format, counted from the app's anonymous usage data.

  • Microsoft Project .mpp50%
  • Microsoft Project template .mpt0%
  • Project XML (MSPDI)41%
  • MPX0%
  • Primavera .xer3%
  • Primavera XML0%
  • Excel workbook1%
  • CSV1%
  • Other5%

Microsoft Project .mpp format families

Of 400 .mpp uploads whose format family was recorded. A family spans several Project releases, so this says which file format is in use, not which release saved it.

  • MPP14 (Project 2010 to 2021)95%
  • MPP12 (Project 2007)2%
  • MPP9 (Project 2000 to 2003)3%
  • MPP8 (Project 98)0%
  • Another format family0%

How we counted: free and anonymous uploads to the Schedule Health Check, the MPP viewer, Onplana Schedule and the Schedule Risk Analyzer. Paying customers’ plans are never included. We read counts only, never file, task or company names. Any figure from fewer than 20 schedules is left out. Read the Privacy Policy section.

Back to all insights

How does your schedule compare?

Run the same DCMA checks on your own plan in the browser, see how likely it is to finish on time with the Schedule Risk Analyzer, or open it on Windows and Mac with Onplana Schedule. All three are free.