Back to BlogConstruction Schedule by Trade: Build It Week by Week
Scheduling

Construction Schedule by Trade: Build It Week by Week

A construction schedule by trade has one row per trade, numbered weeks across the top and finish-to-start links with lag between trades. Build one in six steps.

Onplana Team5 min read

A builder planning a job by week number needs one thing from the schedule: a row for each trade, a column for each week, and the order the trades follow each other. A construction schedule by trade is exactly that, and the part most spreadsheets miss is the links, because the plan only stays true when a late trade pushes the ones behind it.

In short. A construction schedule by trade lists each trade or work package (a lot) as a row, numbers the weeks across the top, and links the trades with finish-to-start dependencies plus lag where work must cure or be inspected. Build the work breakdown by trade, set the links, then read the week-numbered Gantt and share it with the subcontractors.

You can build this on the Free plan: Build the week-by-trade plan on the free plan, no card needed, and start from the steps below.

Why bother with logic rather than a drawn grid? Glenn Ballard's 2000 University of Birmingham thesis notes that earlier research found "substantial improvement in productivity" for firms that raised plan reliability to the 70% level (Ballard, 2000). A plan with links is a plan you can check against what actually happened.

Run the free Look-Ahead Schedule tool Open your own .mpp, Project XML or .xer and get the tasks starting, finishing or under way in the window you pick, ready to print or export. The viewer asks before it converts a file. Open the Look-Ahead Schedule tool

How do you set up a construction schedule by trade?

Start from the work breakdown, not the calendar. Each trade or work package becomes a parent task, and the activities inside it become subtasks. For a house, the parents might be groundworks, frame, roof, first fix, plaster and second fix. For a block of units, add one parent per lot where the lots run at different times.

Keep the structure shallow. The Onplana docs say subtasks are one level deep by design, so put the trade on the parent and the activities beneath it, and put a lot in the parent's name when you need one trade per lot. If you are new to the idea, how to structure a work breakdown for a build covers the thinking behind the split.

How do you number the weeks?

Week numbers are a convention you add, not a switch. Pick the date of week 1, usually the start on site, and write the week number into your outputs: the table you print, the header of the shared PDF, the look-ahead. The Gantt offers Day, Week, Month and Year timescales, so set it to Week to read the plan the way the site does. The chart does not label weeks by number, so anchor week 1 with one calendar date and say so on every printout.

How do you link trades with finish-to-start and lag?

Link each trade to the one it waits on with a finish-to-start link. In Onplana, open a task, choose the predecessor and the link type, and set a lag in days, hours or weeks if the work needs one. Lag is stored as working time, and a week is five working days. Double-clicking the arrow on the Gantt edits it too.

Use lag for waiting that is not work: concrete curing before the frame, plaster drying before second fix, an inspection booked for a fixed gap. Lead and lag in task dependencies explains when a lag is right and when it hides a real task.

Link Where it fits in a trade schedule Example
Finish-to-start One trade cannot start until the last finishes Frame after groundworks
FS with lag The same, with waiting time between Screed, then 2 weeks to dry, then floor finishes
Start-to-start Trades overlap once the first is under way First fix starts once the roof is started
Finish-to-finish Two trades must close together Second fix finishes with plaster touch-ups

What does the week-numbered Gantt show?

The diagram below shows six trades across ten weeks, with the links that move one trade when another slips.

Six trades across ten numbered weeks with finish-to-start links Trade W1W2W3W4W5W6W7W8W9W10 Groundworks Frame Roof First fix Plaster Second fix lag

Read it left to right and then down. If groundworks slip a week, the lag-bearing link to the frame moves the frame, and everything behind it moves with it. The critical path, which Onplana calculates for you, tells you which of those slips changes the finish week. Construction Gantt chart software and what a builder needs lists what to check in the tool you choose.

How do you share the plan with subcontractors?

Share a view they can read, not the whole model. On the paid plans you can invite a subcontractor as a guest, with guest seats included on every paid plan and none on Free; the allowance varies by plan, so read the pricing page before you promise one. Export the chart as a PDF for those who will not log in, with the week 1 date in the header.

Then run the weekly cycle: roll forward a three-week window, clear what blocks each crew, and record what slipped. The three-week look-ahead is the method, and the plan here is the master it reads from. For the product side, Onplana's construction scheduling approach shows how the pieces fit together on a build.

What this does not replace

A schedule is not a site log. Onplana does not replace daily logs, RFIs, submittal registers or drawing management, so keep those in the tool built for them. What it adds is the one part a spreadsheet cannot: a plan where trades are linked, the critical path is calculated, and a slip shows its consequence.

Build the week-by-trade plan on the free plan, put week 1 in the header, and send the subcontractors the chart before the first trade starts.

Build the week-by-trade plan on the free plan Create the trades, link them with lag, and read the week-scale Gantt. No card needed. Start on the free plan

construction schedule by tradeconstruction schedule by weekconstruction execution plantrade sequencing construction schedulework breakdown structureLagScheduling

Frequently asked questions

What is a construction schedule by trade?

It is a schedule with one row per trade or work package, such as groundworks, frame, roof and first fix, laid against a week-numbered timeline. Each row shows when that trade is on site, and links between rows show who has to finish before the next starts.

How do you sequence trades in a construction schedule?

Link each trade to the one it depends on with a finish-to-start link, then add lag where the work needs time to cure, dry or be inspected. The sequence then follows the logic, so a late trade moves everyone behind it.

Why number the weeks instead of using dates?

Week numbers give the site team and the subcontractors one shared reference that does not change when a start date moves. The honest limit is that a week number still needs a start date behind it, so keep one calendar date as the anchor.

Can I use a spreadsheet for a week-by-trade plan?

Yes for a small job, but a spreadsheet will not move the trades behind a late one. Once trades depend on each other, links and a calculated critical path save the rework.

Can subcontractors see the schedule without a full licence?

On the paid plans, a subcontractor can be invited as a guest, and guest seats are included on every paid plan; the Free plan has none. Read the current allowance on the pricing page before you promise a number.

How many weeks ahead should the trade schedule go?

Keep the whole job on the master and plan the next two to three weeks in crew-level detail. The week-by-trade view is the master; the look-ahead is the window you work from.