Modelos de projeto gratuitos
Comece com um plano, não com um quadro vazio. Cada modelo abaixo vira um projeto real e totalmente editável no Onplana (17 abrem direto da sua página, os outros são importados da sua planilha), com fases, tarefas agendadas com prioridades e estimativas, e marcos incluídos, no plano Free sem cartão de crédito. Todos também podem ser baixados como planilha para Excel ou Google Sheets, sem cadastro.
Sem cartão de crédito. Os modelos estão no plano Free.
Software Product Launch
Ship your next product on a plan that already exists. This launch template lays out the full arc, customer discovery, MVP build, closed beta, and GA day, as 12 scheduled tasks with priorities, effort estimates, and two launch milestones. Open it in Onplana and you start from a working plan instead of a blank board.
Marketing Campaign
Plan, produce, launch, and measure an integrated campaign without reinventing the checklist. This campaign template covers the whole cycle, goals and channel mix, creative production, paid and owned launch, and the post-campaign retrospective, as 10 scheduled tasks across four phases with a go-live milestone at day 28.
Event Planning
Run your event on a 90-day countdown instead of a sticky-note wall. This event planning template sequences everything from venue tours and speaker outreach to badge printing, volunteer briefings, and the day-of run sheet, 14 scheduled tasks across five phases, each timed backwards from event day.
Migration from MS Project
Move your Microsoft Project schedules with a plan, not a prayer. This template sequences a 30-day move of your .mpp and Project XML files into Onplana: inventory and stakeholder sign-off, collecting and cleaning the files, staging import, reconciliation and pilot UAT, then the production import. It ships with a pre-logged risk about legacy custom-field mapping, so the most common surprise is already on your radar.
Data Migration Cutover
A migration project plan for SharePoint, Microsoft 365, file server and Azure moves, as an Excel file or a live project. Migrations do not fail at the copy, they fail at the edges: permissions that did not come across, a wave sized from a lab measurement, and the delta nobody ran. This plan sequences a 60-day move as waves rather than a weekend, with a pilot signed off before wave one, a delta sync behind every wave, and two pre-logged risks that account for most of the overruns.
OKR Quarterly Planning
Run a complete OKR cycle, not just a kickoff meeting. This quarterly OKR template schedules the whole 90 days: drafting company objectives, workshopping key results, cascading to teams, weekly check-ins, a mid-quarter review, and end-of-quarter scoring. Eight tasks across four phases keep the cadence honest from week 1 to week 13.
Client Engagement
A consulting engagement that starts without agreed acceptance criteria ends in an argument about the final invoice. This template schedules the whole nine weeks: signed scope and rate card first, discovery that tests what the statement of work assumed, delivery with change requests priced as they arise, and a close that ends in written acceptance and a margin review.
Phase-Gate Product Development
Phase-gate development works when the gates are real decisions and fails when they are status meetings. This template schedules six months from concept to market with four explicit gate reviews, each one a go, no-go, or recycle with the reviewers and conditions recorded, plus the design freeze that turns every later change into formal change control.
RIBA Plan of Work (Architecture)
Architecture practices lose fees between stages, not inside them: the concept change reworked into Stage 3 without a variation, the construction-stage hours that outrun the Stage 5 share. This template lays the RIBA Plan of Work 2020 out as eight phases, with a client sign-off closing each of Stages 1 to 4, so the fee schedule, the programme and the hours are one record from Stage 0 to handover.
AIA Design Phases (Architecture, US)
The AIA phases already come with a fee split most owners recognise: 15 percent schematic design, 20 design development, 40 construction documents, 5 bidding, 20 construction administration. What practices lose is the link between that split and the hours, when a design-development change is drawn into the construction documents without an additional-services request. This template lays the five phases out, with an owner approval closing each of the three design phases, so the approval, the fee share and the hours are one record.
Construction Documents and Closeout
Closeout is where a building project drifts for months: the punch list that never quite closes, the manuals nobody delivered, the retainage released too early. This template plans it from the day the construction documents are issued, with a closeout list agreed at preconstruction, submittals and RFIs through construction administration, a punch list backed to zero, and every manual, warranty, record drawing and lien waiver in hand before final payment.
Annual Portfolio Plan
Next year's portfolio as one plan you can argue about before it is funded. Eight sample initiatives, each with a case for it, the delivery and a check on whether it paid off, sit as phases on one timeline, with the plan approval and four portfolio reviews as milestones. Opened in Onplana, it also brings a capacity sheet by role and quarter and a one-page scoring guide, so the debate about what fits runs on numbers.
Project Schedule
A general project schedule for a 12-week project, laid out the way a schedule is built: charter and kickoff, a work breakdown with a duration on every task, a baseline, three work packages, the weekly control loop running alongside them, and a proper close. Rename the work packages and it fits most projects that are not yet sure what shape they are.
Project Timeline
A six-month project on one page: a month to discover, two to design and build, one to test, one to launch and one to measure what it achieved. Fewer, longer tasks than a working schedule, and a milestone at the end of each stretch, so it reads at a glance in a steering meeting.
Construction Project
A building project from the general contractor's side, start to handover: estimate, permits and buyout in preconstruction, then site work and foundations, the frame, the envelope, MEP rough-in and interiors, and closeout to the certificate of occupancy. About 36 weeks for a small commercial building, with the inspections and the dry-in date where they really fall.
Agile Project
A nine-week agile project: a short sprint 0 to write the vision, build the first backlog and agree the definition of done, three two-week sprints with planning, delivery and a review and retrospective, then a release sprint to harden, ship and refine the backlog for what comes next.
Project Tracker
A plain project tracker: set up, plan, do, review and close, 15 tasks in all, and three columns on every row for the questions a tracker answers each week: what state is it in, who has it, and how far along is it. Every row starts at Not started, no owner and 0 percent, ready for your names.
Project Milestones
A plan built around its milestones: seven of them, from the approved brief to the closed project, and before each one a sign-off task that says what proves it was met. Fill in the work between them and the milestones stay the dates everyone outside the team watches.
Perguntas frequentes
Esses modelos de projeto são mesmo gratuitos?
Sim. Cada modelo desta página é baixado como planilha sem cadastro e abre no plano gratuito do Onplana sem cartão de crédito e sem limite de tempo, seja direto pelo botão "Use this template", seja importando a planilha. Você recebe o plano completo, com fases, tarefas com prioridades e durações, e marcos, como um projeto real que é seu e que você pode editar.
O que acontece quando clico em "Use this template"?
Você cria uma conta gratuita no Onplana (ou entra), e o modelo abre como um projeto funcional: as fases viram grupos coloridos, as tarefas são agendadas a partir de hoje com durações realistas e os marcos aparecem na linha do tempo. A partir daí você renomeia, reatribui e reagenda como em qualquer outro projeto.
Posso editar um modelo depois de abri-lo?
Totalmente. Um modelo é só um ponto de partida: cada tarefa, fase, marco, data e prioridade é editável, e você alterna entre as visões de lista, quadro, Gantt e calendário. Nada fica bloqueado.
Posso salvar meus próprios modelos?
Sim. Além desta galeria, o Onplana permite salvar qualquer projeto como modelo reutilizável para a sua organização nos planos pagos, para que o plano de lançamento que você aprimora neste trimestre vire o ponto de partida do próximo.
Abra um modelo e pule a página em branco
Escolha um modelo, cadastre-se grátis e seu plano estará agendado antes da reunião de kickoff. Sem cartão de crédito, sem limite de tempo.